Skip to main content

Slovakian road protests likely over missing D3 sections

More road blockades are likely after Slovakia’s state motorway company NDS announced it will not tender for missing sections of the D3 motorway this year. Residents of some towns have blocked sections of roads this year urging the government to speed construction of the D3 to help; boost their local economies, according to Slovakian media.
September 1, 2017 Read time: 1 min

More road blockades are likely after Slovakia’s state motorway company 5891 NDS announced it will not tender for missing sections of the D3 motorway this year.

Residents of some towns have blocked sections of roads this year urging the government to speed construction of the D3 to help; boost their local economies, according to Slovakian media.

The missing sections are Zilina, Brodno - Kysucke Nove Mesto and Kysucke Nove Mesto - Oscadnica.

The only section of the D3 motorway nearing completion is the 4.2km Zilina, Strazov - Zilina, Brodno stretch being built by the consortium of SMS, 981 Hochtief and 3281 Eurovia at a cost €255 million. It is set to open in November.

For more information on companies in this article

Related Content

  • Island Roads is on the march along the UK’s Isle of Wight
    November 21, 2018
    Ringway Island Roads recently completed a major 12km upgrade to one of the UK’s most iconic roads. The upgrade to the Military Road, on the Isle of Wight in the English channel, is the largest carriageway improvement project delivered in a single scheme by Ringways’ Island Roads division. The project was part of the Isle of Wight’s Highway Improvement Programme which is financed in the main through a grant of €535 million awarded by the UK’s Department for Transport. The section between the villages
  • Research shows male drivers more likely to overtake rashly
    April 12, 2013
    A new survey carried out in the UK reveals that male drivers are more likely to risk lives by overtaking blind and speeding on rural roads. As a result male drivers are being urged to be more careful. The survey was carried out jointly by safety body Brake and insurance firm Direct Line. The data reveals that 24% risk catastrophic head-on crashes by overtaking blind, while 44% admit speeding at over the national speed limit of 96km/h (60mph) on rural roads. Men are much more likely to take these deadly risk
  • STRABAG will lead A4 highway deal in Poland
    May 9, 2013
    Austrian contractor STRABAG is heading a consortium handling work to complete a section of Poland’s A4 highway between Krzyż and Dębica Pustynia. STRABAG’s subsidiary Heilit+Woerner is responsible for the contract, which was awarded by Poland’s General Directorate for National Roads and Highways (GDDKiA). The contract is worth €236 million (PLN 981 million), of which Heilit+Woerner has a 50% share. The work will be carried out over a 35km section of the route over and 18 month period. The work includes the
  • Pakistan secures loans for the M4 Khanewal and Shorkot section
    June 16, 2016
    The China-based Asian Infrastructure Investment Bank and the Philippines-based Asian Development Bank will co-finance a 64km highway project between Khanewal and Shorkot towns in Punjab province of Pakistan. A report in Japan Today said that ADB had approved a €88.85 million loan for the project. AIIB will likely get board approval for its nearly €89 million this month. A grant for the project worth nearly €34 million is being extended by the UK’s Department of International Development. The Pakistan