Skip to main content

Slovakian road protests likely over missing D3 sections

More road blockades are likely after Slovakia’s state motorway company NDS announced it will not tender for missing sections of the D3 motorway this year. Residents of some towns have blocked sections of roads this year urging the government to speed construction of the D3 to help; boost their local economies, according to Slovakian media.
September 1, 2017 Read time: 1 min

More road blockades are likely after Slovakia’s state motorway company 5891 NDS announced it will not tender for missing sections of the D3 motorway this year.

Residents of some towns have blocked sections of roads this year urging the government to speed construction of the D3 to help; boost their local economies, according to Slovakian media.

The missing sections are Zilina, Brodno - Kysucke Nove Mesto and Kysucke Nove Mesto - Oscadnica.

The only section of the D3 motorway nearing completion is the 4.2km Zilina, Strazov - Zilina, Brodno stretch being built by the consortium of SMS, 981 Hochtief and 3281 Eurovia at a cost €255 million. It is set to open in November.

For more information on companies in this article

Related Content

  • Bulgaria: back on track?
    July 23, 2012
    Several important Bulgarian road projects are expected to gain momentum over the coming weeks, a welcome boost for a sector that has been beset by delays in the past. In mid-September, the National Road Infrastructure Agency (NRIA) announced that it would soon be declaring new tenders for the construction of two key road projects worth a total of US$94 million (approximately €68.8 million). One section will link the south-eastern city of Kardzhali to Podkova, near the Greek border: the second will connect t
  • Slovakia’s roads and bridges to be improved
    April 15, 2019
    A new plan from Slovakia’s Ministry for Transport and Construction will see upgrade work being carried out to 180km of major roads and 60 or more bridges. A finance package of €200 million has been secured for the work, which will be carried out over the next 36 months. This programme of works is being financed by the OP Integrated Infrastructure (OPII) fund. At present, 122km of dual carriageways and motorways are under construction in Slovakia according to the state-owned road firm NDS. Completion of the
  • Europe closes in on the crossings
    September 27, 2017
    The Mersey Gateway bridge project off England’s west coast passed a milestone recently with the first joining of two of the deck sections. The key segments, as the sections are called, link the north approach viaduct to the north pylon deck span and are the first of four deck-joins scheduled for this summer. In total, there are five sections of bridge deck and approach roads that need to be joined.
  • Funding problems for major Polish highway project
    May 9, 2012
    The long tale of woe concerning Poland’s troubled A2 highway project looks set to continue with the latest developments in the case. The Chinese contractor China Overseas Engineering Group Co (Covec) is appealing against a decision made by the Polish national road authority GDDKiA. The Polish authorities cancelled the contract that COVEC had previously been awarded to build a section of the A2 highway between Warsaw and Lodz.