Skip to main content

Slovakian road protests likely over missing D3 sections

More road blockades are likely after Slovakia’s state motorway company NDS announced it will not tender for missing sections of the D3 motorway this year. Residents of some towns have blocked sections of roads this year urging the government to speed construction of the D3 to help; boost their local economies, according to Slovakian media.
September 1, 2017 Read time: 1 min

More road blockades are likely after Slovakia’s state motorway company 5891 NDS announced it will not tender for missing sections of the D3 motorway this year.

Residents of some towns have blocked sections of roads this year urging the government to speed construction of the D3 to help; boost their local economies, according to Slovakian media.

The missing sections are Zilina, Brodno - Kysucke Nove Mesto and Kysucke Nove Mesto - Oscadnica.

The only section of the D3 motorway nearing completion is the 4.2km Zilina, Strazov - Zilina, Brodno stretch being built by the consortium of SMS, 981 Hochtief and 3281 Eurovia at a cost €255 million. It is set to open in November.

For more information on companies in this article

Related Content

  • D3 Tabor-Veseli motorway section in Czech Republic opens
    July 3, 2013
    The newly built US$522.81 million (CZK 10.45bn) D3 motorway section between Tabor and Veseli nad Luznici in the Czech Republic has officially opened. The partially EU funded 25km route was built by a consortium of four companies Eurovia CS, Strabag, Metrostav and Inzinierske Stavby. The motorway section includes 48 bridges, 277 construction objects and ten sound barriers.
  • Delays ahead for Slovakia’s Visnove tunnel
    September 5, 2018
    Slovakia's transport ministry says the 7.5km Visnove tunnel near Zilina, part of the D1 motorway, will be delayed by two years to open in 2022. The recent announcement came as the ministry agreed to an extension to the construction permit held by Salini Impregilo for work on the twin-tube tunnel. The design-and-build contract worth about €410 million was assigned to the Salini Impregilo-led joint venture DUHA in 2014 by the National Highway Company NDS.
  • NDS to spend US$2.21bn on Zilina, Slovakia motorways
    July 1, 2013
    NDS, the Slovak national motorway company, plans to spend US$2.21 billion (€1.7bn) between 2013 and 2016 on motorway construction projects in the Zilina region of Slovakia. Milan Gajdos, the firm’s managing director and chairman, said that post 2016 a further $1.04 billion (€800mn) will be invested in the region. Currently, tenders worth $1.82 billion (€1.4bn) for motorway projects in the region are already underway, including tenders for stretches of the D1 and D3 motorways. It is still not known whether t
  • U-turn on Slovakian motorway tender
    June 22, 2012
    The Italian-Slovak consortium of HANT BA DS and INC has been excluded by the Slovak national motorway company NDS from the tender for the construction of a 15.25km stretch of the Hubova-Ivachvova D1 motorway in Slovakia. Slovak company HANT BA DS has asked NDS to revaluate its decision as it claims that its offer fulfils all tender conditions. The consortium offered the lowest price of US$259.44mn (€207.50mn) excluding VAT. Italian partner INC claims that exclusion from the tender was unfounded and said it