Skip to main content

Slovakia: D4/R7 Bratislava bypass work to start early this year

Construction will start early this year on 59km of highway as part of the D4/R7 bypass of the Slovakian capital Bratislava. Ferrovial through its subsidiaries Cintra Infraestructuras and Ferrovial Agroman is leading the consortium on the public-private partnerships deal worth around €1.9 billion, according to media reports. Ferrovial reached financial close on the project in June, noting that their investment would be around €975 million. The first stage of the design, build, financing, operate and ma
January 10, 2017 Read time: 2 mins
Construction will start early this year on 59km of highway as part of the D4/R7 bypass of the Slovakian capital Bratislava.

2717 Ferrovial through its subsidiaries 930 Cintra Infraestructuras and Ferrovial Agroman is leading the consortium on the public-private partnerships deal worth around €1.9 billion, according to media reports. Ferrovial reached financial close on the project in June, noting that their investment would be around €975 million.

The first stage of the design, build, financing, operate and maintain project should be completed in 2020, with the second and final stage in 2021.

The project is being funded by the European Investment Bank (EIB), EBRD and the Slovak investment group Slovensky Investicny Holding. The state will make annual payments of nearly €53million for 30 years to the operator of the motorway D4 and expressway R7.

The D4-R7 project comprises the construction of a new 27km of D4 highway, with two lanes each way, between Jarovce and Raca, creating a beltway to the east of the city and connecting the existing radial roads.

The project also includes building a 32km radial highway – the R7 – which will have two or three lanes each way, running in a south-easterly direction from the city centre.

The D4-R7 contract the first project in Slovakia for Cintra which manages over 2,100km of toll roads in 28 concessions in the Americas, Oceania and Europe. Cintra is also the largest shareholder in the 407 ETR concessionaire, around the Canadian city of Toronto, with a stake of 43.23%. The other shareholders in 407ETR are indirectly owned subsidiaries of Canada Pension Plan Investment Board (40%), and by SNC-Lavalin (16.77%).

For more information on companies in this article

Related Content

  • Autostrade del Lazio awards Sacyr company SIS the Roma-Latina deal
    July 15, 2016
    SIS, a subsidiary of Spanish contractor Sacyr, has won a €2.8 billion contract to build and operate the 186km Roma-Latina motorway in Italy. Autostrade Del Lazio, a public company created to build and manage the motorway, awarded the public private partnership contract, officially called Corridoio intermodale Roma-Latina e collegamento Cisterna-Valmontone. The SIS Scpa consortium, which consists of Sacyr (49%) and Fininc di Torino (51%), will build-operate-maintain the highway over 50 years. Revenue i
  • New highway works planned for India
    February 10, 2025
    Major new highway works are planned for India.
  • Skanska to start Black Cat upgrade
    November 30, 2023
    The A428 upgrade work in England was awarded in 2021 to create a 16km dual carriageway to improve journeys between Milton Keynes, Bedford and Cambridge, near London.
  • Strabag wins Polish road contract
    September 17, 2018
    Austrian contractor Strabag has won a stake in a design and build road contract in Poland. The project is worth a total of €133 million and involves building a section of highway carrying three lanes in either direction. The firm will work on the project to build another stretch of the A1 highway in Poland. The 17km long Section C begins at the Kamieńsk junction and ends at Radomsko, where the construction of a motorway interchange forms part of the order.