Skip to main content

Slovakia concerned over tenders for D1 Presov and D3 Cadca bypasses

The Slovakian government is examining bids for two tenders for motorway stretches D1 because of their higher-than-expected costs. The deal involves the Presov West - Presov South stretch and the D3 Cadca, Bukov - Svrcinovec section, according to a report in Pravda. Both projects are bypasses of Cadca, near the border with Poland and the Czech Republic, and Presov in eastern Slovakia. The newly appointed transport minister, Arpad Ersek, review the tenders, the Pravda report said. The Slovak Insti
September 14, 2016 Read time: 2 mins
The Slovakian government is examining bids for two tenders for motorway stretches D1 because of their higher-than-expected costs.

The deal involves the Presov West - Presov South stretch and the D3 Cadca, Bukov - Svrcinovec section, according to a report in Pravda.

Both projects are bypasses of Cadca, near the border with Poland and the Czech Republic, and Presov in eastern Slovakia.

The newly appointed transport minister, Arpad Ersek, review the tenders, the Pravda report said.

The Slovak Institute or Economic and Social Reforms claims that both stretches have been overpriced by €100 million.

In the case of the 5.7km D3 Cadca by-pass, the consortium of 981 Hochtief, 945 Strabag and 3976 Porr submitted the lowest bid, at just over €239 million compared to the expected €199 million.

For the 7.4km D1 Presov bypass, the lowest bid of slightly more than €356 million was submitted by the consortium of Metrostav, 2877 Doprastav and 3281 Eurovia.

For more information on companies in this article

Related Content

  • STRABAG’s German highway assets increased
    October 4, 2018
    STRABAG has increased its stake in the A8 motorway operator PANSUEVIA. This share has been boosted from 50% to 100%. PANSUEVIA operates the autobahn stretch that runs between Ulm and Augsburg in the south of the country. SRABAG purchased the 50% stake in PANSUEVIA that was previously held by HOCHTIEF. As a result, STRABAG is now the 100% owner of the concession company operating the Ulm–Augsburg section of the A8 autobahn. Both parties agreed not to disclose the purchase price however. This section of the
  • Strabag wins Polish road contract
    September 17, 2018
    Austrian contractor Strabag has won a stake in a design and build road contract in Poland. The project is worth a total of €133 million and involves building a section of highway carrying three lanes in either direction. The firm will work on the project to build another stretch of the A1 highway in Poland. The 17km long Section C begins at the Kamieńsk junction and ends at Radomsko, where the construction of a motorway interchange forms part of the order.
  • Poland: Ministry decides to build missing section of A1 motorway
    October 24, 2016
    The Polish government said that it will complete the final 80km section of the A1 motorway at a cost of around €830 million. Money will come out of the National Road fund (KFD), according to the Ministry of Infrastructure and Construction. The missing section stretches from Tuszyn to Czestochowa and the government will choose contractors in September 2017. Completion is set for 2020. Earlier this year, Strabag was awarded a contract to build a further section of the A1 motorway, around 16.7km betwe
  • Budimir-Bidovce section of Slovakia D1 motorway link could begin in 2014
    October 15, 2012
    The construction of the 14.4km D1 motorway stretch between Budimir - Bidovce near Kosice in eastern Slovakia could begin in 2014 or 2015. Building works for the Budimir-Bidovce D1 route should take three years, followed by the construction of another stretch of the D1 from Bidovce up to the Ukrainian border. The latter works are estimated for completion sometime after 2020. Meanwhile, the construction of the 13km D1 stretch linking Bidovce - Dargov and the 18.7km stretch Dargov - Pozdisovce should start in