Skip to main content

Slovakia concerned over tenders for D1 Presov and D3 Cadca bypasses

The Slovakian government is examining bids for two tenders for motorway stretches D1 because of their higher-than-expected costs. The deal involves the Presov West - Presov South stretch and the D3 Cadca, Bukov - Svrcinovec section, according to a report in Pravda. Both projects are bypasses of Cadca, near the border with Poland and the Czech Republic, and Presov in eastern Slovakia. The newly appointed transport minister, Arpad Ersek, review the tenders, the Pravda report said. The Slovak Insti
September 14, 2016 Read time: 2 mins
The Slovakian government is examining bids for two tenders for motorway stretches D1 because of their higher-than-expected costs.

The deal involves the Presov West - Presov South stretch and the D3 Cadca, Bukov - Svrcinovec section, according to a report in Pravda.

Both projects are bypasses of Cadca, near the border with Poland and the Czech Republic, and Presov in eastern Slovakia.

The newly appointed transport minister, Arpad Ersek, review the tenders, the Pravda report said.

The Slovak Institute or Economic and Social Reforms claims that both stretches have been overpriced by €100 million.

In the case of the 5.7km D3 Cadca by-pass, the consortium of 981 Hochtief, 945 Strabag and 3976 Porr submitted the lowest bid, at just over €239 million compared to the expected €199 million.

For the 7.4km D1 Presov bypass, the lowest bid of slightly more than €356 million was submitted by the consortium of Metrostav, 2877 Doprastav and 3281 Eurovia.

For more information on companies in this article

Related Content

  • Boring complete for Slovakia’s Bikos Tunnel
    June 11, 2021
    The 1km tunnel is part of the 4.5km dual carriageway R4 Prešov bypass.
  • Strabag wins German A3 Autobahn contract
    July 24, 2015
    Austrian contract STRABAG has won the tender process to widen the A3 Autobahn in southern Germany. The contract will see the firm widening the A3 to six lanes in a deal worth €90 million. The A3 connects the cities of Frankfurt and Nuremburg. STRABAG has been awarded the EO 287 contract to widen a 5.7km section of the road using asphalt construction methods in the state of Bavaria. It has also won the EO 259 contract to widen an 8.5km section of road using asphalt construction methods in the state of in Bad
  • STRABAG reports satisfactory financial performance
    February 22, 2016
    Construction firm STRABAG says that its performance in the 2015 financial year was ‘satisfactory’ and that its outlook for 2016 is positive. “We closed an overall satisfactory year in 2015 with a higher output volume on nearly unchanged employee levels and a lower order backlog. In 2016 we want to maintain the output volume at its high level and raise our EBIT margin to 3%. Thanks to our improved risk management and cost reductions, we are confident that we will reach this goal after having also succeeded i
  • Slovakia road works programme
    November 4, 2021
    Slovakian road improvement works are being carried out.