Skip to main content

Skanska wins Norway E16 phase three

The winning bid for the 8.4km section from Bjørum to Skaret was €279 million.
By David Arminas November 26, 2020 Read time: 2 mins
Bjørum-to-Skaret (Credit: Statens vegvesen)

Skanska has won a turnkey contract for construction of Norway’s E16 highway from Bjørum to Skaret in the municipality of Hole.

Skanska’s winning bid for the 8.4km section was €279 million and done in co-operation with consulting firm Aas-Jakobsen. It was lower than bids from competitors Implenia/Multiconsult and AF Gruppen/Norconsult.

Work for four-lane motorway to have a speed limit of 100kph will include construction of two motorway junctions, five bridges of up to 220m in length, an 800m-long tunnel and one at 3.4km.

The stretch of 3.5km up to Sollihøgda has a maximum 5% grade and is characterised by large rock cuts to be done with extensive blasting work and earth relocation.

The project is part of Norway’s National Transport Plan 2018-29 and completion is expected in summer 2025.

The existing E16 will be maintained as a local road with additional cycling and walking paths constructed.

The new E16 is part of a larger plan, the E16 Sandvika-to-Skaret-to-Høgkastet. The aim is to develop a faster and more predictable travel time connection between Oslo and Øvre Buskerud, Vest-Oppland and Vestlandet.
    
The overall E16 project is divided into four sections.

The Sandvika-Wøyen section was started in 2015 and opened to traffic in 2019. The local road system around Sandvika (the Sandvika ring) will be completed in the summer of 2021.

The Wøyen-Bjørum section has been completed as a four-lane motorway and was opened in 2009.

The section from Skaret to Høgkastet has been approved and is in the planning stage.

 

Video: Construction of the Bjørum-to-Skaret includes two motorway junctions, five bridges of up to 220m in length, an 800m-long tunnel and one at 3.4km

For more information on companies in this article

Related Content

  • Metrostav and Bertelsen & Garpestad in E8 deal
    June 9, 2023
    The Norwegian project includes 10km of new road and an 870m-long bridge across the Ram Fjord, part of the European route E8 between Norway and Finland.
  • PERI’s balancing act at the Harpe Bru Bridge in Norway
    May 24, 2016
    Plans for the European Route E6 expansion in Norway include the 320m-long Harpe Bru Bridge over the Gudbrandsdalen Lågen River, at Sør-Fron in Oppland province. For the superstructure, PERI civil engineering technology experts developed a balanced cantilevered solution based on the VARIOKIT Engineering Construction Kit. Statens vegvesen, Norway’s agency for public road building, selected an extradosed cable-stayed bridge design – the first such bridge in Norway. It combines the load-bearing behaviour
  • COWI wins Danish motorway upgrades
    July 13, 2022
    The tenders for the two motorway projects in Kolding and Randers leaned heavily on sustainability including big cuts of CO₂.
  • China looks to the future with major highway plans
    February 15, 2012
    China is still moving ahead with plans that will give it the world's biggest highway system. Patrick Smith reports. As China's economy grows even more, keeping the country on the move has become a priority for the government. While the country has made great strides over the past decade in improving its infrastructure, the number of vehicles has also increased rapidly, and in some instances restrictions have been placed on them.