Skip to main content

Skanska wins Norway E16 phase three

The winning bid for the 8.4km section from Bjørum to Skaret was €279 million.
By David Arminas November 26, 2020 Read time: 2 mins
Bjørum-to-Skaret (Credit: Statens vegvesen)

Skanska has won a turnkey contract for construction of Norway’s E16 highway from Bjørum to Skaret in the municipality of Hole.

Skanska’s winning bid for the 8.4km section was €279 million and done in co-operation with consulting firm Aas-Jakobsen. It was lower than bids from competitors Implenia/Multiconsult and AF Gruppen/Norconsult.

Work for four-lane motorway to have a speed limit of 100kph will include construction of two motorway junctions, five bridges of up to 220m in length, an 800m-long tunnel and one at 3.4km.

The stretch of 3.5km up to Sollihøgda has a maximum 5% grade and is characterised by large rock cuts to be done with extensive blasting work and earth relocation.

The project is part of Norway’s National Transport Plan 2018-29 and completion is expected in summer 2025.

The existing E16 will be maintained as a local road with additional cycling and walking paths constructed.

The new E16 is part of a larger plan, the E16 Sandvika-to-Skaret-to-Høgkastet. The aim is to develop a faster and more predictable travel time connection between Oslo and Øvre Buskerud, Vest-Oppland and Vestlandet.
    
The overall E16 project is divided into four sections.

The Sandvika-Wøyen section was started in 2015 and opened to traffic in 2019. The local road system around Sandvika (the Sandvika ring) will be completed in the summer of 2021.

The Wøyen-Bjørum section has been completed as a four-lane motorway and was opened in 2009.

The section from Skaret to Høgkastet has been approved and is in the planning stage.

 

Video: Construction of the Bjørum-to-Skaret includes two motorway junctions, five bridges of up to 220m in length, an 800m-long tunnel and one at 3.4km

For more information on companies in this article

Related Content

  • Slovakia starts on Presov northern bypass
    August 15, 2019
    Work has started on the first stage of the 4.3km-long Presov northern bypass, part of the R4 speedway in eastern Slovakia.
  • Bechtel and Enka win highway contract for Kosovo
    July 2, 2014
    Bechtel and its joint-venture partner Enka have won a contract to build a 60km highway connecting Kosovo’s capital Pristina with neighbouring Macedonia. The new Route 6 highway will help improve Kosovo’s transport links, a highly important factor for the future economic development of this small, landlocked nation. Bechtel-Enka previously constructed Kosovo’s Route 7 highway, which was completed in November 2013, a whole year ahead of schedule. The Route 7 highway with Morina on the Albanian border through
  • Poland's A1 motorway progressing well
    February 9, 2012
    The second major phase of a north-south motorway in Poland is well underway. It will reduce congestion and improve safety as Patrick Smith reports Before the whistle blows to herald the start of Euro 2012, Poland's main seaport Gdansk will boast new roads, a new airport and a new stadium. The historic city in the north of the country on the Baltic coast will be one of the venues for football's 14th European Championship, being co-hosted by Poland and Ukraine.
  • A new highway for northern Colombia
    July 17, 2023
    The Pamplona-Cúcuta highway is playing an important role for the development of northern Colombia