Skip to main content

Skanska wins Norway E16 phase three

The winning bid for the 8.4km section from Bjørum to Skaret was €279 million.
By David Arminas November 26, 2020 Read time: 2 mins
Bjørum-to-Skaret (Credit: Statens vegvesen)

Skanska has won a turnkey contract for construction of Norway’s E16 highway from Bjørum to Skaret in the municipality of Hole.

Skanska’s winning bid for the 8.4km section was €279 million and done in co-operation with consulting firm Aas-Jakobsen. It was lower than bids from competitors Implenia/Multiconsult and AF Gruppen/Norconsult.

Work for four-lane motorway to have a speed limit of 100kph will include construction of two motorway junctions, five bridges of up to 220m in length, an 800m-long tunnel and one at 3.4km.

The stretch of 3.5km up to Sollihøgda has a maximum 5% grade and is characterised by large rock cuts to be done with extensive blasting work and earth relocation.

The project is part of Norway’s National Transport Plan 2018-29 and completion is expected in summer 2025.

The existing E16 will be maintained as a local road with additional cycling and walking paths constructed.

The new E16 is part of a larger plan, the E16 Sandvika-to-Skaret-to-Høgkastet. The aim is to develop a faster and more predictable travel time connection between Oslo and Øvre Buskerud, Vest-Oppland and Vestlandet.
    
The overall E16 project is divided into four sections.

The Sandvika-Wøyen section was started in 2015 and opened to traffic in 2019. The local road system around Sandvika (the Sandvika ring) will be completed in the summer of 2021.

The Wøyen-Bjørum section has been completed as a four-lane motorway and was opened in 2009.

The section from Skaret to Høgkastet has been approved and is in the planning stage.

 

Video: Construction of the Bjørum-to-Skaret includes two motorway junctions, five bridges of up to 220m in length, an 800m-long tunnel and one at 3.4km

For more information on companies in this article

Related Content

  • UGL wins Australia’s NorthConnex M&E services contract
    September 7, 2015
    Engineering services provider UGL has signed a four-year deal with the Lend Lease Bouygues joint venture that is building the NorthConnex motorway in Sydney, Australia. The US$329 million contract is for the design, procurement, construction and commissioning of the electrical, mechanical, communication, fire and control systems needed for the project’s 9km twinned tolled tunnel. UGL provides outsourced engineering, asset management and maintenance services to rail, transport, power, resources, water an
  • Norway to use Trimble technology
    January 13, 2023
    Norway is to use Trimble software technology.
  • Developing India’s roads with new machines
    February 10, 2017
    As part of the government’s plans to accelerate economic growth, a major expansion of India’s road network is underway Many cities in India are set to benefit from the government’s ambitious plan to use infrastructure investment to boost the economy. There are currently 11 ongoing projects across India’s road network, funded by the World Bank. Once complete, the road network will make travelling more efficient and boost India’s economic activity. The initiative will see the construction of new major
  • Tunnel driven by TBM
    August 7, 2020
    A major tunnel drive has been carried out by a TBM in Italy.