Skip to main content

Skanska to Slovakia’s D1 motorway for €214 million

Skanska has won a contract with the National Highway Authority (NDS) to extend the 14.4km long motorway D1 in eastern Slovakia. The new motorway will include 23 bridges and four viaducts, along with required noise protection. Another R2/R4 express road will also be extended.
September 6, 2016 Read time: 1 min

2296 Skanska has won a contract with the 3577 National Highway Authority (NDS) to extend the 14.4km long motorway D1 in eastern Slovakia.

The new motorway will include 23 bridges and four viaducts, along with required noise protection. Another R2/R4 express road will also be extended.

Financing will come from the European Regional Development Fund's project OP Integrated Infrastructure 2014-2020 and Slovakia’s state budget. Construction is expected to start in November and take three years.

For more information on companies in this article

Related Content

  • Slovakia continues to ponder an 8km Little Carpathian road tunnel
    February 12, 2015
    Controversy continues to swirl around Bratislava’s proposed D4 motorway bypass and what tunnel options under the Little Carpathian Mountains is the best value.
  • Bulgaria: back on track?
    July 23, 2012
    Several important Bulgarian road projects are expected to gain momentum over the coming weeks, a welcome boost for a sector that has been beset by delays in the past. In mid-September, the National Road Infrastructure Agency (NRIA) announced that it would soon be declaring new tenders for the construction of two key road projects worth a total of US$94 million (approximately €68.8 million). One section will link the south-eastern city of Kardzhali to Podkova, near the Greek border: the second will connect t
  • Slovakia’s D1 motorway Korbelka tunnel could cost €278mn
    August 19, 2016
    The D1 motorway tunnel Korbelka in Slovakia is estimated to now cost €278 million, according to a report in Pravda Slovakia. But the chosen 6km route is a safer option than another route alongside the Vah River that would have taken in a potential landslide area. Because of the slide risk, a further €202 million would be needed to shore up the hillside. More work will have to be done to finalise the route, meaning work would not start until likely 2019, according to the report. Slovakia's Transport
  • U-turn on Slovakian motorway tender
    June 22, 2012
    The Italian-Slovak consortium of HANT BA DS and INC has been excluded by the Slovak national motorway company NDS from the tender for the construction of a 15.25km stretch of the Hubova-Ivachvova D1 motorway in Slovakia. Slovak company HANT BA DS has asked NDS to revaluate its decision as it claims that its offer fulfils all tender conditions. The consortium offered the lowest price of US$259.44mn (€207.50mn) excluding VAT. Italian partner INC claims that exclusion from the tender was unfounded and said it