Skip to main content

Serbia’s Nis-Pristina motorway inches ahead

Serbia will cooperate with Albania on construction of the proposed Nis-Merdare-Prishtina motorway, according to media reports. Serbian vice president and Minister of Construction, Transport and Infrastructure, Zorana Mihajlovic, said that the motorway will be part of a larger project to give faster access, through Pristina, capital of Kosovo, to Albania’s Adriatic Sea port of Drac.
October 24, 2016 Read time: 1 min
Serbia will cooperate with Albania on construction of the proposed Nis-Merdare-Prishtina motorway, according to media reports.

Serbian vice president and Minister of Construction, Transport and Infrastructure, Zorana Mihajlovic, said that the motorway will be part of a larger project to give faster access, through Pristina, capital of Kosovo, to Albania’s Adriatic Sea port of Drac.

In September, Mihajlovic said that design work for the Nis-Merdare-Prishtina motorway should be finished in the first half of 2017 with completion of the highway set for 2020.

Around 600 contractors are working in Serbia building 250km of motorways, including work on more than 70km between Leskovac and the Macedonian border and around 100km between Belgrade and Preljina.

Related Content

  • Europe closes in on the crossings
    September 27, 2017
    The Mersey Gateway bridge project off England’s west coast passed a milestone recently with the first joining of two of the deck sections. The key segments, as the sections are called, link the north approach viaduct to the north pylon deck span and are the first of four deck-joins scheduled for this summer. In total, there are five sections of bridge deck and approach roads that need to be joined.
  • Serbian highway work underway
    April 1, 2022
    Serbian highway work is underway at present.
  • Slovakia’s R2 Expressway moves a step closer
    June 4, 2018
    Slovakia said it will tender this year for the 14km R2 expressway linking Roznava and Jablonov nad Turnov with completion likely in 2024. Slovakia's transport minister Arpad Ersek said construction could start by Q3 2019. R2 is a 360km route that will run from Kosice in the east across the country to Trenčín, near the Czech border in the west. It will pass through Bánovce nad Bebravou, Prievidza and Lučenec. Roznava is an economic and tourist centre around 70km from Kosice.
  • Route 54 Næstved-Rønnede upgrade coming
    March 19, 2024
    The motorway project on the Danish island of Zealand could entail upgrading the two-lane Route 54 and will likely start in 2026.