Skip to main content

Serbian highway construction project

Serbia is planning to build the new Sumadijski Koridor motorway. The project is expected to cost €1.7 billion to €2 billion to build. Financing is being provided by the Serbian Government. The final alignment has yet to be determined but the route is expected to measure from 220km to 270km in length. The new highway will connect with other key road links and will be called the Vozd Karadjordje.
August 27, 2019 Read time: 1 min

Serbia is planning to build the new Sumadijski Koridor motorway. The project is expected to cost €1.7 billion to €2 billion to build. Financing is being provided by the Serbian Government. The final alignment has yet to be determined but the route is expected to measure from 220km to 270km in length. The new highway will connect with other key road links and will be called the Vozd Karadjordje.

Related Content

  • Poland’s next A2 motorway section to cost €348million
    January 21, 2019
    Almost €348 million will be needed for a 32km extension to Poland’s A2 motorway from Biala Podlaska to Terespol, near the border with Belarussia. A tender for a design and build contract is expected to be called in 2020. But funding is still not for certain under the National Road Construction Programme that looks at work until 2023. Recently, a €1.3 million contract was signed with Multiconsult Polska to prepare an investment plan. The A2 runs from west to east through central Poland, from the Pol
  • Bosnia road tunnel project
    December 4, 2020
    A key Bosnian road tunnel project is underway.
  • Pakistan’s major motorway project
    March 7, 2025
    Pakistan’s major motorway project will deliver a key economic boost.
  • Plans to extend highway 427 in Canada
    May 21, 2013
    Plans are in hand in Canada to extend Highway 427 by 6.6km. The final decision over the project has yet to be made by the Ontario Government. The work is expected to cost in the region of C$500 million (US$491 million) to carry out. The work is required as the highway carries a heavy traffic volume and the extension will help reduce congestion in the surrounding area. The work should commence in 2017 once the necessary approvals have been given and the construction would then require an estimated 36 months.