Skip to main content

Serbia, Turkey formalise cooperation for Belgrade-Sarajevo motorway

Serbia has cemented its cooperation deal with Turkey for construction of the Belgrade-Sarajevo motorway at an estimated cost of around €830 million. The 60km motorway will be an extension of the Corridor 11 project and start where the 31km long Preljine-Pozega segment of Corridor 11 ends, Serbian media reported.
October 20, 2017 Read time: 2 mins
Serbia has cemented its cooperation deal with Turkey for construction of the Belgrade-Sarajevo motorway at an estimated cost of around €830 million.


The 60km motorway will be an extension of the Corridor 11 project and start where the 31km long Preljine-Pozega segment of Corridor 11 ends, Serbian media reported.

Belgrade-Sarajevo motorway will run from Pozega via Uzice to Kotroman on the border with Bosnia and Herzegovina of which Sarajevo is the capital.

The cooperation agreement was signed during the recent visit to Serbia of Turkish president Recep Erdogan. Zorana Mihajlovic, Serbia’s deputy prime minister and minister of construction, transport and infrastructure, signed a wide-ranging letter of intent with her Turkish counterpart, Ahmet Arslan to cooperate on more infrastructure projects.

“This is not the first project that Serbia is implementing together with Bosnia and Herzegovina, but it is definitely the largest one, following the construction of the Ljubovija-Bratunac bridge, the construction of a nursery and the reconstruction of the main street in Srebrenica and joint maintenance of the bridges of the Drina River,” Mihajlovic said.

Corridor 11 runs from the Serbian capital Belgrade southwest to the border with Montenegro, another member state of the former Yugoslavia, a country that dissolved into constituent parts after a brutal war in the 1990s.

Serbia has been working with Chinese firms on sections of Corridor 11 for several years.

Related Content

  • Turkey to tender for Izmir-Candarli beltway contract
    November 15, 2016
    Turkish highway authorities will tender construction of the remaining part the Izmir-Menemen-Aliaga-Candarli motorway on 15 February. The contract will be build-operate-transfer for the 76km section between the towns of Aliaga and Candarli. Constructions is expected to take three years. The 16km section between Izmir and Menemen is already finished, according to Turkish media. Up to 60,000 vehicles a day are projected to use the highway from Izmir to Candarli. It is officially called the Otoyol 30
  • Strabag picks up Czech D1 motorway deal
    December 21, 2018
    Strabag is to modernise nearly 15km of the D1 motorway in the Czech Republic under a contract worth nearly €73 million. Work includes complete renewal of the cement concrete surface between Velký Beranov and Měřín to be done within three years. Working on the project are the consortium leader Strabagm based in Austria, and its two partner companies Metrostav and EUROVIA’s Czech subsidiary. The project will begin with a temporary widening of the motorway in the direction of Prague to allow full reno
  • Ghana bridge project receiving Japan loan
    December 8, 2016
    A loan of US$100 million will help pay for a bridge spanning the Volta River in Ghana.
  • Iraq, Turkey, UAE, Qatar sign road MoU
    May 2, 2024
    The four countries wish to improve road connections from Iraq to Turkey for exporting and importing from Europe and Asia.