Skip to main content

Serbia, Turkey formalise cooperation for Belgrade-Sarajevo motorway

Serbia has cemented its cooperation deal with Turkey for construction of the Belgrade-Sarajevo motorway at an estimated cost of around €830 million. The 60km motorway will be an extension of the Corridor 11 project and start where the 31km long Preljine-Pozega segment of Corridor 11 ends, Serbian media reported.
October 20, 2017 Read time: 2 mins
Serbia has cemented its cooperation deal with Turkey for construction of the Belgrade-Sarajevo motorway at an estimated cost of around €830 million.


The 60km motorway will be an extension of the Corridor 11 project and start where the 31km long Preljine-Pozega segment of Corridor 11 ends, Serbian media reported.

Belgrade-Sarajevo motorway will run from Pozega via Uzice to Kotroman on the border with Bosnia and Herzegovina of which Sarajevo is the capital.

The cooperation agreement was signed during the recent visit to Serbia of Turkish president Recep Erdogan. Zorana Mihajlovic, Serbia’s deputy prime minister and minister of construction, transport and infrastructure, signed a wide-ranging letter of intent with her Turkish counterpart, Ahmet Arslan to cooperate on more infrastructure projects.

“This is not the first project that Serbia is implementing together with Bosnia and Herzegovina, but it is definitely the largest one, following the construction of the Ljubovija-Bratunac bridge, the construction of a nursery and the reconstruction of the main street in Srebrenica and joint maintenance of the bridges of the Drina River,” Mihajlovic said.

Corridor 11 runs from the Serbian capital Belgrade southwest to the border with Montenegro, another member state of the former Yugoslavia, a country that dissolved into constituent parts after a brutal war in the 1990s.

Serbia has been working with Chinese firms on sections of Corridor 11 for several years.

Related Content

  • Corridor for prosperity: The 5G Road
    June 14, 2019
    The next generation of highways will be a matrix of smart, intelligent and dynamic technologies that lower maintenance costs and ensure user safety. But challenges lie ahead, as Geoff Hadwick discovered in Dubrovnik The fifth-generation road is about to provide the world’s highway authorities with a big leap forward. This “forever-open”, self-healing road will integrate innovation into infrastructure, vehicles and entire intelligent transport systems, says Adewole Adesiyun, deputy secretary general of
  • Ring road for Sarajevo nears completion
    December 17, 2012
    The Sarajevo Ring Road in Bosnia and Herzegovina is expected to be completed by October 2012. The construction of the 5.6km long highway from Josanica to Butila is being carried out by a consortium of companies made up of HP Investing and Strabag. The completed Ring Road will be part of the future Corridor Vc motorway. Bosnia and Herzegovina Federal Minister of Transport and Telecoms, Enver Bijedic, and State Minister of Telecoms and Transport and Director of the roads company JP Ceste FBiH, Filip Vujevo, r
  • Serbia Corridor 11 motorway works due to begin in March 2013
    January 23, 2013
    Miodrag Jocic, State Secretary from the Serbian Ministry of Construction, , said the Chinese company Shandong High Speed Group (SHSG) will begin construction of Serbia’s new Corridor 11 motorway in March 2013. The Lajkovac-Ljig section of the project is said by Jocic to be completely ready for construction. The overall project value is estimated at US$333 million. Jocic said that the parts between Surcinska Petlja to Obrenovac in Belgrade, and from Preljina to Pozega will be most likely financed with a conc
  • Champlain Bridge set to open by end of year, says SNC-Lavalin
    May 14, 2018
    The Canadian city’s replacement Champlain Bridge will open on schedule at the end of the year. Montreal, one of Canada’s largest cities, will have a well-earned Christmas present in December when the new Champlain Bridge opens after 42 months of construction. The new bridge, part of a six-lane 6km corridor including roads, is being built alongside the original bridge over the Saint Lawrence River and Seaway canal system. The new bridge, 3.4km long, runs from the île des Soeurs to Brossard, immediately dow