Skip to main content

Serbia in talks with Chinese firms over Corridor 11 completion

Serbia will enter into talks with two Chinese companies chosen through a tender process that expired this month for restarting construction on the stalled Corridor 11 motorway. Serbian Minister of Construction Zorana Mihajlovic said Shandong Hi-Speed Group and the China Road and Bridge Corporation qualified for tender participation. Work includes construction and maintenance of 17.6km of motorway near Belgrade, between Surcin and Obrenovac as welll as the 31km Preljina-Pozega road and maintenance of t
February 12, 2015 Read time: 2 mins

Serbia will enter into talks with two Chinese companies chosen through a tender process that expired this month for restarting construction on the stalled Corridor 11 motorway.

Serbian Minister of Construction Zorana Mihajlovic said 3034 Shandong Hi-Speed Group and the 3366 China Road and Bridge Corporation qualified for tender participation.

Work includes construction and maintenance of 17.6km of motorway near Belgrade, between Surcin and Obrenovac as welll as the 31km Preljina-Pozega road and maintenance of the 103km Obrenovac-Preljina road.

The Belgrade-Pozega road will connect Serbia with Montenegro to the west and Romania to the east. China's Exim Bank approved a loan of €295.06 million for construction of the 50km road between Lajkovac and Ljig as well as Obrenovac and U, on Corridor 11.

Part of Corridor 11 was to be built under a concession awarded to the Austrian firm 2859 Alpine and Romanian company 3976 PORR, as well maintenance work for the Novi Sad-Belgrade highway. However, with the collapse of Alpine in mid-2013, the contract had to be renegotiated.

For more information on companies in this article

Related Content

  • Serbia: Putevi Srbije to build 2.4km of Corridor 11 access road
    April 14, 2015
    Serbian road contractor Putevi Srbije will build around 2.4km of access roads around the town of Ljig in central Serbia, according the state Ministry of Construction, Transport and Infrastructure. The access roads will be for the Corridor 11 motorway, which is under construction from the Serbian capital Belgrade running southwest into Montenegro, ending at the Adriatic coastal tourist town of Bar. The Belgrade-Bar motorway will be around 280km long and be the main link for a ferry service from the Ita
  • Key highway sections to be completed in Serbia in 2017
    January 16, 2017
    A series of major highway sections in Serbia should be completed during 2017, including work to two stretches of the key Corridor 10 project. In all, some 122km of highways are expected to be opened to traffic in Serbia during 2017. Greek contractor Actor is building an 18km stretch of Corridor 10 that runs from Surcin to Obrenovac part. This firm is also building a 19.5km section of Corridor 10 from the Ostruznica Bridge that spans the Sava River to Bubanj Potok, and a further 10km section leading to Buban
  • Work on Serbian highway to be carried out by Chinese company Shandong High Speed Group
    December 10, 2013
    Chinese firm Shandong High Speed Group is to carry out a portion of the construction activity for Serbia’s Corridor 11 highway. The company will commence work on the section between Obrenovac to Ub and from Lajkovac to Ljig shortly. The agreement was signed between the Shandong High Speed Group and the Serbian Government. Work on the project is due to for completion within 37 months. Exactly which portions of the construction work on these sections has not been revealed however. At present several sections
  • Serbia: Laz, Munjino Brdo tunnels restart
    June 3, 2020
    The tunnels are part of the A2, also called the Miloš the Great Motorway.