Skip to main content

Serbia seals the deal for start of Belgrade Corridor 11 ring-road

Serbian vice president Zorana Mihajlovic has held talks with Li Manchang, China's Ambassador to Serbia in Serbia, for continuation of works on Belgrade’s ring road. According to the political magazine B92, Mihajlovic also signed a memorandum of understanding with Azvirt, the company from Azerbaijan, and China's Sinohidro. Discussions included continuation of work on the Surcin-Obrenovac part of the Corridor 11 motorway. A commercial deal for the project has already been signed with the China Communica
July 21, 2016 Read time: 2 mins
Serbian vice president Zorana Mihajlovic has held talks with Li Manchang, China's Ambassador to Serbia in Serbia, for continuation of works on Belgrade’s ring road.

According to the political magazine B92, Mihajlovic also signed a memorandum of understanding with 5414 Azvirt, the company from Azerbaijan, and China's Sinohidro.

Discussions included continuation of work on the Surcin-Obrenovac part of the Corridor 11 motorway. A commercial deal for the project has already been signed with the China Communication Construction Company.

In November, Serbia’s Tanjug news agency reported that Serbian Prime Minister Aleksandar Vucic said the deal was worth around €209 million and included construction of the 18km Surcin-Obrenovac bridge. Corridor 11 runs from the Serbian capital Belgrade southwest to the border with Montenegro, another member state of the former Yugoslavia that dissolved after a brutal war in the late 1990s.
 
Vucic told Serbia's state broadcaster RTS that the arrangement with China was "a very favourable credit arrangement with a lengthy grace period" that was based on a “dramatically” lower construction cost.

For more information on companies in this article

Related Content

  • New Zealand’s ‘Roads of national significance programme’ to end 2024?
    June 19, 2012
    New Zealand Transport Agency (NZTA) has told Transport Minister Gerry Brownlee that the completion of the government's roads of national significance programme might be pushed to 2024, as certain key motorway projects could take up to three years longer than anticipated. Under the NZ$9 billion (US$6.92 billion) plus programme, NZ$2.40 billion will be used for the Waikato Expressway; followed by another $2 billion for Auckland Western Ring Route including Waterview Connection; $1.76 billion for the highway b
  • Official sale of M6 Toll to be launched in September
    August 23, 2016
    An information memorandum that will officially launch the sale of M6 Toll, the UK’s only toll road, will be sent out to interested buyers in September. No date is set for sending out the IM, according to sources, but the 43km six-lane asset around the English city of Birmingham could be going for slightly less after the UK’s European Union referendum vote in June. The result of the so-called Brexit – ‘British exit’ of the EU – referendum was won by the no-to-Europe side and the UK is now setting up t
  • Aecon sells Ontario road business to GIP
    May 18, 2023
    Canadian infrastructure group Aecon has sold its Ontario-based construction and aggregates business Aecon Transportation East to Green Infrastructure Partners.
  • Lagos shortlists for Fourth Mainland Bridge
    December 12, 2022
    A consortium led by Mota-Engil is one of three shortlisted for the Nigerian project.