Skip to main content

Serbia seals the deal for start of Belgrade Corridor 11 ring-road

Serbian vice president Zorana Mihajlovic has held talks with Li Manchang, China's Ambassador to Serbia in Serbia, for continuation of works on Belgrade’s ring road. According to the political magazine B92, Mihajlovic also signed a memorandum of understanding with Azvirt, the company from Azerbaijan, and China's Sinohidro. Discussions included continuation of work on the Surcin-Obrenovac part of the Corridor 11 motorway. A commercial deal for the project has already been signed with the China Communica
July 21, 2016 Read time: 2 mins
Serbian vice president Zorana Mihajlovic has held talks with Li Manchang, China's Ambassador to Serbia in Serbia, for continuation of works on Belgrade’s ring road.

According to the political magazine B92, Mihajlovic also signed a memorandum of understanding with 5414 Azvirt, the company from Azerbaijan, and China's Sinohidro.

Discussions included continuation of work on the Surcin-Obrenovac part of the Corridor 11 motorway. A commercial deal for the project has already been signed with the China Communication Construction Company.

In November, Serbia’s Tanjug news agency reported that Serbian Prime Minister Aleksandar Vucic said the deal was worth around €209 million and included construction of the 18km Surcin-Obrenovac bridge. Corridor 11 runs from the Serbian capital Belgrade southwest to the border with Montenegro, another member state of the former Yugoslavia that dissolved after a brutal war in the late 1990s.
 
Vucic told Serbia's state broadcaster RTS that the arrangement with China was "a very favourable credit arrangement with a lengthy grace period" that was based on a “dramatically” lower construction cost.

For more information on companies in this article

Related Content

  • Serbian bridge to go ahead
    July 3, 2012
    DELAYS are facing construction work on Serbia’s Corridor 10 highway project. The country’s present administration has explained that the previous government left debts of €300 million and that many planned projects had been left uncompleted, with only the draft of the Serbian Urban Plan being finished. The Dimitrovgrad Ring Road is opening to traffic but other links are delayed or well behind schedule. Meanwhile a €170 million deal for construction of the Zemun-Borca Bridge has been signed with Chinese comp
  • Serbia to tender for Nis-Pristina motorway by end of 2018
    March 6, 2018
    The first tender for construction of the Nis-Pristina motorway could be called by the end of his year, according to Zorana Mihajlovic, Serbia’s minister of construction. Value of the first phase of the project is estimated at €240 million. Around 20% of the amount will be financed from aid, while the remainder will be secured by the EBRD (European Bank for Reconstruction and Development) and the EIB (European Investment Bank).
  • Bulgaria: back on track?
    July 23, 2012
    Several important Bulgarian road projects are expected to gain momentum over the coming weeks, a welcome boost for a sector that has been beset by delays in the past. In mid-September, the National Road Infrastructure Agency (NRIA) announced that it would soon be declaring new tenders for the construction of two key road projects worth a total of US$94 million (approximately €68.8 million). One section will link the south-eastern city of Kardzhali to Podkova, near the Greek border: the second will connect t
  • Serbia and China discuss Preljina-Boljare section of Corridor XI
    September 4, 2017
    Serbia is in talks with China for construction of the Preljina - Boljare section of the pan-European Corridor XI. The section will connect Corridor XI to Corridor X. Corridor XI will run from the Montenegrin port of Bar to Belgrade and on to Bucharest, Romania. Corridor X links Salzburg, Austria, with the Greek Aegean port of Thessaloniki port, via Croatia, Slovenia, Serbia and Macedonia. This includes the construction of a motorway bypass of Belgrade.