Skip to main content

Serbia pushes ahead with Nis-Pristina route into Kosovo

The Serbian government has announced that work on the new highway from Nis to Pristina, capital of neighbouring Kosovo, is expected to start next year. The motorway will eventually connect Serbia and Albania, to the west of Kosovo, ensuring a main fast transport route for the western Balkans region. Details have not been disclosed but the cost is likely to be around €800 million.
March 20, 2017 Read time: 1 min
The Serbian government has announced that work on the new highway from Nis to Pristina, capital of neighbouring Kosovo, is expected to start next year.

The motorway will eventually connect Serbia and Albania, to the west of Kosovo, ensuring a main fast transport route for the western Balkans region. Details have not been disclosed but the cost is likely to be around €800 million.

Related Content

  • Progress on Serbia’s Zezeljev bridge replacement is slow
    August 30, 2017
    Construction of the Zezeljev rail and road bridge across the Danube River is facing further delays, according to the Serbian government. Work on the 470m-long new bridge was supposed to be finished by this month. But national elections and changes of government have hampered progress, Serbian media have reported. The original bridge was completed in 1961 as a single-track railway line and separate roadway between the cities of Novi Sad and Petrovaradin. NATO attacked the structure five times during its camp
  • Congestion and safety concerns over Serbia’s roads
    February 23, 2012
    With traffic flows on the increase, Serbia needs to improve its road network and safety record, reports Gordon Feller. Serbia's road network needs to upgrade its road system against the backdrop of increased traffic flows. Serbia is crossed by segments of the important Trans European network (TEN). Corridor X with its branches Xb (Belgrade-Budapest) Xc (Nis-Sofia), and Xd (Nis-Presevo), represent the most important transit routes in the Republic, connecting Austria/Hungary, Slovenia/Croatia, and Bulgaria/Ma
  • Delay for major Serbian highway project
    August 19, 2016
    Construction work on Serbia’s Ljig-Preljina highway, the Corridor 11 Project, is being delayed. The delay has been caused by complications involving the construction of the tunnel and bridge sections. The construction work is being carried out by the Azerbaijan contractor Azvirt, with local firms carrying out sub-contracting projects. The new route is expected to open around 40 days later than originally expected as a result. Meanwhile the improving political relations between Serbia and its neighbour Ko
  • Chinese firms to work on Serbia’s Corridor 11 project
    November 30, 2015
    Serbia and China have signed a memorandum of understanding for construction of two sections of Serbia’s Corridor 11. The MoU was inked in during Serbian Prime Minister Aleksandar Vucic’s visit to the Chinese capital Beijing last week. Serbia’s Tanjug news agency reported that Vucic said the deal was worth around €209 million and included construction of the 18km Surcin-Obrenovac bridge. Corridor 11 runs from the Serbian capital Belgrade southwest to the border with Montenegro, another member state of