Skip to main content

Serbia: over 150km of motorway built in past two years

Serbia’s Ministry of Construction, Transport and Infrastructure has reported that in the past two year period, over 150km of motorways have been built. Ministry said that the new Corridor 10 has been opened, including the Zezeljev rail and road bridge in Novi Sad. The old bridge was built in 1961 and destroyed in 1999 during NATO bombing.
July 4, 2019 Read time: 1 min
Serbia’s Ministry of Construction, Transport and Infrastructure has reported that in the past two year period, over 150km of motorways have been built.


Ministry said that the new Corridor 10 has been opened, including the Zezeljev rail and road bridge in Novi Sad. The old bridge was built in 1961 and destroyed in 1999 during NATO bombing.

Related Content

  • Serbia inks two road deals with China at 16plus1 summit
    April 23, 2019
    Serbia said it signed two road construction agreements with China during the 16plus1 Summit in Dubrovnik, Croatia earlier this month. The two deals are for construction of the Pozega-Boljare and Novi Beograd-Surcin road routes. The Pozega-Boljare project alone is worth €2 billion and will be financed from the existing loan from the Exim Bank, according to media reports. China’s east-west Belt and Road Initiative was the focus of the annual 16plus1 Summit that brought together leaders from Beijing plus
  • Serbia’s Corridor 11 highway concession
    October 8, 2013
    In Serbia plans are moving forward for the Corridor 11 highway. The contract for the 48km of highway looks set to be carried out under a concession model by Chinese companies. The deal will also involve the 103km Obrenovac-Preljina highway. The cost of the Corridor 11 highway project has not yet been disclosed. A decision has yet to be made regarding the Horgos-Belgrade-Pozega highway. Part of this route was to be built under a concession awarded to Alpine and Porr and this deal included work on some 250km
  • Serbia: end in sight for finishing southern part of Corridor 10
    August 26, 2016
    Serbia’s minister of construction and infrastructure, Zorana Mihajlovic, said that the southern part of the Corridor 10 motorway is expected to be completed by the end of 2017. Speaking to the Beta news agency, she also said that work on the Corridor 11 motorway, on the Ub-Lajkovac section, is being carried out in cooperation with Chinese partner company Shang Dong. The government has also signed an agreement for construction of the Surcin-Obrenovac part of the Corridor 11. Ongoing talks between Serbi
  • Serbia Corridor 11 motorway works due to begin in March 2013
    January 23, 2013
    Miodrag Jocic, State Secretary from the Serbian Ministry of Construction, , said the Chinese company Shandong High Speed Group (SHSG) will begin construction of Serbia’s new Corridor 11 motorway in March 2013. The Lajkovac-Ljig section of the project is said by Jocic to be completely ready for construction. The overall project value is estimated at US$333 million. Jocic said that the parts between Surcinska Petlja to Obrenovac in Belgrade, and from Preljina to Pozega will be most likely financed with a conc