Skip to main content

Serbia: over 150km of motorway built in past two years

Serbia’s Ministry of Construction, Transport and Infrastructure has reported that in the past two year period, over 150km of motorways have been built. Ministry said that the new Corridor 10 has been opened, including the Zezeljev rail and road bridge in Novi Sad. The old bridge was built in 1961 and destroyed in 1999 during NATO bombing.
July 4, 2019 Read time: 1 min
Serbia’s Ministry of Construction, Transport and Infrastructure has reported that in the past two year period, over 150km of motorways have been built.


Ministry said that the new Corridor 10 has been opened, including the Zezeljev rail and road bridge in Novi Sad. The old bridge was built in 1961 and destroyed in 1999 during NATO bombing.

Related Content

  • Traffic control to beat congestion
    November 6, 2012
    Max Lay discusses how congestion has posed problems throughout history from early civilisation to the present day One of the earliest known human settlements was at the Springs of Elisha at Jericho. Inevitably, locals collecting fresh water from the springs would encounter other water carriers. When a path was too narrow, or access to it was too limited, or it crossed another path, some carriers would find it necessary to stand aside for others. Priority in such cases might be based on common courtesy and p
  • Hardstaff Barriers to recycle all PPE
    February 8, 2022
    Hardstaff is working with Granite Workwear which has launched its own textile destruction and recycling service for old or damaged workwear and personal protective equipment - PPE.
  • Czech motorway building to be accelerated in 2017
    December 12, 2016
    The Czech government is to speed up motorway building in 2017, with 140km of new roads planned. The announcement comes as the country is looking at a new laws designed to streamline infrastructure tendering and to improve construction management, according to CIJ – Construction and Investment Journal. Projects can sometimes take as long as 12 years to get off the ground, the journal reported. Skanska boss Michal Jurka, the head of Skanska in the Czech Republic and Slovakia since September, said p
  • Arched bridge challenge over the Oparno
    February 29, 2012
    For environmental reasons planners decided in favour of the challenging task of constructing a 13-field arched highway bridge over the Oparno Valley in the Bohemian area of the Czech Republic. The 258m bridge, whose reinforced concrete arch has a span of 135m, straddles the valley without any bridge piers, transferring the loads in the form of compressive forces into the foundations.