Skip to main content

Serbia: Laz, Munjino Brdo tunnels restart

The tunnels are part of the A2, also called the Miloš the Great Motorway.
By David Arminas June 3, 2020 Read time: 1 min
When finished, the A2 will run from the capital Belgrade to a future Boljare border crossing with Montenegro (photo © Ebastard129/Dreamstime)

Work has restarted on two of the largest tunnels along Serbia’s A2 motorway, also called the Miloš the Great Motorway.

The 2.9km Laz Tunnel and 2.8km Munjino Brdo tunnel are part of the 31km Preljina-Pozega section of the A2.

Work was halted along parts of the route as the country went into lockdown over the Covid-19 pandemic.

Serbia struck a deal with China Communications Construction Company – CCCC - worth €450 million in 2017 for construction of the Preljina-Pozega section. The route also includes the 360m Trbušani Tunnel.

When finished, Serbia’s A2 will run for 258km from the capital Belgrade south towards Montenegro ending at a future Boljare border crossing. This motorway will provide faster link with Montenegro by attaching to its Bar-Boljare motorway, currently under construction. The route is part of the pan-European Corridor XI which will include a ferry linking Bari in Italy with Bar in Montenegro.

Related Content

  • Serbia ponders Chinese firm for Pozega-Boljare concession
    March 17, 2017
    Serbian prime minister Aleksandar Vucic said that part of the future Pozega-Boljare motorway towards Montenegro could be let under a concession to China. Meanwhile, Serbian minister of construction and infrastructure Zorana Mihajlovic, has said that around €9 billion of all types of infrastructure projects are underway. Included is the Corridor 10 motorway, due for completion by the beginning of 2018 and the 103km Obrenovac-Preljina motorway set for completion by the end of this year, as well as project
  • Serbia: Putevi Srbije to build 2.4km of Corridor 11 access road
    April 14, 2015
    Serbian road contractor Putevi Srbije will build around 2.4km of access roads around the town of Ljig in central Serbia, according the state Ministry of Construction, Transport and Infrastructure. The access roads will be for the Corridor 11 motorway, which is under construction from the Serbian capital Belgrade running southwest into Montenegro, ending at the Adriatic coastal tourist town of Bar. The Belgrade-Bar motorway will be around 280km long and be the main link for a ferry service from the Ita
  • Romanian highway works commencing
    July 15, 2022
    Highway works are commencing in Romania.
  • Italy's Messina Strait bridge
    March 20, 2023
    The Messina Strait Bridge project in Italy is being revived.