Skip to main content

Serbia approves merger of Koridori Srbije and Putevi Srbije

Serbia’s Ministry of Construction, Transport and Infrastructure has approved a merger between the public-owned roads companies Putevi Srbije (Roads of Serbia) and Koridori Srbije (Corridors of Serbia). Putevi Srbije maintains roads while Koridori focuses on construction planning and project management, including expropriation of land. The government said the merger will contribute to faster completion of projects such as stretches of Europe’s Corridor 10 and Corridor 11 road networks and hopefully red
November 25, 2014 Read time: 2 mins
Serbia’s Ministry of Construction, Transport and Infrastructure has approved a merger between the public-owned roads companies Putevi Srbije (Roads of Serbia) and 3235 Koridori Srbije (Corridors of Serbia).

Putevi Srbije maintains roads while Koridori focuses on construction planning and project management, including expropriation of land.

The government said the merger will contribute to faster completion of projects such as stretches of Europe’s Corridor 10 and Corridor 11 road networks and hopefully reduce construction costs by around 20%.

Corridor 10 is a major pan-European transport corridor under construction that runs south from Salzburg in Austria to Hungary, Slovenia, Croatia, Serbia, Bulgaria, Macedonia and finally to the north-eastern Greek port of Thessalonica.

The east-west Corridor 11 connects Timisoara in Romania to the Serbian capital Belgrade and then runs south-west to end in the Montenegro port of Bar, a major port for ferries across the southern Adriatic to the Italian port of Bari.

In January this year in Belgrade, Serbia’s Minister of Construction Velimir Ilic signed a memorandum of cooperation with GIDC, a joint venture between the Serbian government and Global Capital Advisors Management from the United Arab Emirate. GIDC is advising on the financial aspects of constructing Corridor 11 from western Serbia to the border with Montenegro.

Putevi Srbije’s reputation suffered a significant downturn last year when workers from 26 major construction companies downed tools in a strike demanding the state company pay owed wages. Unions claimed that Putevi Srbije Putevi The union claimed the state owed road construction companies around $98 million, according to a report at the time by %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal Serbia&#8217;s national news agency Tanjug Visit : www.b92.net/eng/news page false http://www.b92.net/eng/news/society.php?yyyy=2013&amp;mm=06&amp;dd=26&amp;nav_id=86755 false false%>.

For more information on companies in this article

Related Content

  • VIDEO: Barcelona wheelchair user weaving in traffic, passes cars
    July 25, 2016
    A wheelchair-bound man in Spain has been caught on camera weaving in and out of Barcelona traffic and moving faster than surrounding vehicles. The street racer was cruising along Barcelona's Carrer de Muntaner when a motorcycle passenger took the video. You Tube videos of speeding wheel chair users are becoming more common. But so too are videos of people who generally want more mobility out their wheelchair. So click here to see a more sensible way to live life in your wheelchair in the fast lane. Appa
  • International Transport Forum: public vs private policy debate
    December 4, 2014
    Simply banning cars in parts of major cities will not necessarily greatly improve the air quality over time, a new report has found. The answer for cutting carbon emissions is to get the right balance of private and public transportation along with infrastructure developed to sustain the mix, according to the International Transport Forum (ITF), a think tank within the Organisation of Economic Cooperation and Development (OECD). The ITF evaluated the potential impact of transport policies on urban carbon
  • North Marmara Motorway connecting roads tenders postponed again
    September 2, 2015
    Tenders for construction of connecting roads for Istanbul's third bridge over the Bosporus have been postponed for the fourth time. A tender for the Kurtkoy-Akyazi motorway tender will be held on March 1 next year with that for the Kinali-Odayeri road will be held a week later, the Dünya Gazetesi newspaper reported. The tenders will be held as part of the 260km North Marmara Motorway project that includes the soon to be completed Yavus Sultan Selim Bridge. Completion of the connecting roads is plan
  • Yanmar will show complete line of Tier 4 Final engines, along with an electronic diagnostic system
    January 6, 2017
    Engine supplier Yanmar will show a full range of California Air Resources Board (CARB) certified engines at Bauma. The company claims to be the first engine manufacturer to achieve the CARB accreditation across its complete line-up in the 19-56kW (25-75hp) range, and the engines all meet the US Tier 4 Final standard too. The firm will also announce an electronic diagnostic service system called Smart Assist-Direct. The system allows rapid updates of engine software and can automatically retrieve technical s