Skip to main content

Serbia approves merger of Koridori Srbije and Putevi Srbije

Serbia’s Ministry of Construction, Transport and Infrastructure has approved a merger between the public-owned roads companies Putevi Srbije (Roads of Serbia) and Koridori Srbije (Corridors of Serbia). Putevi Srbije maintains roads while Koridori focuses on construction planning and project management, including expropriation of land. The government said the merger will contribute to faster completion of projects such as stretches of Europe’s Corridor 10 and Corridor 11 road networks and hopefully red
November 25, 2014 Read time: 2 mins
Serbia’s Ministry of Construction, Transport and Infrastructure has approved a merger between the public-owned roads companies Putevi Srbije (Roads of Serbia) and 3235 Koridori Srbije (Corridors of Serbia).

Putevi Srbije maintains roads while Koridori focuses on construction planning and project management, including expropriation of land.

The government said the merger will contribute to faster completion of projects such as stretches of Europe’s Corridor 10 and Corridor 11 road networks and hopefully reduce construction costs by around 20%.

Corridor 10 is a major pan-European transport corridor under construction that runs south from Salzburg in Austria to Hungary, Slovenia, Croatia, Serbia, Bulgaria, Macedonia and finally to the north-eastern Greek port of Thessalonica.

The east-west Corridor 11 connects Timisoara in Romania to the Serbian capital Belgrade and then runs south-west to end in the Montenegro port of Bar, a major port for ferries across the southern Adriatic to the Italian port of Bari.

In January this year in Belgrade, Serbia’s Minister of Construction Velimir Ilic signed a memorandum of cooperation with GIDC, a joint venture between the Serbian government and Global Capital Advisors Management from the United Arab Emirate. GIDC is advising on the financial aspects of constructing Corridor 11 from western Serbia to the border with Montenegro.

Putevi Srbije’s reputation suffered a significant downturn last year when workers from 26 major construction companies downed tools in a strike demanding the state company pay owed wages. Unions claimed that Putevi Srbije Putevi The union claimed the state owed road construction companies around $98 million, according to a report at the time by %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal Serbia&#8217;s national news agency Tanjug Visit : www.b92.net/eng/news page false http://www.b92.net/eng/news/society.php?yyyy=2013&amp;mm=06&amp;dd=26&amp;nav_id=86755 false false%>.

For more information on companies in this article

Related Content

  • Sandvik is now using Volvo Penta engines in its underground trucks and loaders
    January 30, 2013
    Sandvik Mining is now using Volvo Penta engines in its underground trucks and loaders. The advanced engines meet Tier 4 Interim/Stage IIIB emission standards and are claimed to reduce fuel and ventilation costs in comparison with other units. The Volvo Penta engineers designed a selective catalytic reduction (SCR) unit in the exhaust system that converts NOx gas into nitrogen and water. The Volvo Penta exhaust-treatment solution also reduces DPM levels without the need for a diesel particulate filter (DPF).
  • New trailer technology from Goldhofer
    January 6, 2017
    Transportation specialist Goldhofer is introducing a range of new semitrailer and low loader solutions. The new models include innovations in Goldhofer’s heavy-duty modules, as well as trailers and semitrailers for the construction sector. Improved payload capacities, steering performance and ride quality are all claimed. These new trailers are said to be stronger and more durable, as well as benefiting from increased versatility.
  • New trailer technology from Goldhofer
    March 26, 2013
    Transportation specialist Goldhofer is introducing a range of new semitrailer and low loader solutions. The new models include innovations in Goldhofer’s heavy-duty modules, as well as trailers and semitrailers for the construction sector. Improved payload capacities, steering performance and ride quality are all claimed. These new trailers are said to be stronger and more durable, as well as benefiting from increased versatility.
  • Pilosio exhibits its durable P300 formwork at bauma
    January 6, 2017
    Among Pilosio’s comprehensive range of formwork solutions on show at bauma will be the Italian firm’s P300 formwork. Used during the recent construction of a 560m overpass in Bucharest, Romania the P300 is said to be based on a 100x300cm base panel with a few simple accessories, such as a quick connection block to allow extremely rapid framework operations, and a varnished frame and surface counter-cast in 18mm thick, high resistance, multi-layered Finnish panels to ensure high number of uses.