Skip to main content

Serbia approves merger of Koridori Srbije and Putevi Srbije

Serbia’s Ministry of Construction, Transport and Infrastructure has approved a merger between the public-owned roads companies Putevi Srbije (Roads of Serbia) and Koridori Srbije (Corridors of Serbia). Putevi Srbije maintains roads while Koridori focuses on construction planning and project management, including expropriation of land. The government said the merger will contribute to faster completion of projects such as stretches of Europe’s Corridor 10 and Corridor 11 road networks and hopefully red
November 25, 2014 Read time: 2 mins
Serbia’s Ministry of Construction, Transport and Infrastructure has approved a merger between the public-owned roads companies Putevi Srbije (Roads of Serbia) and 3235 Koridori Srbije (Corridors of Serbia).

Putevi Srbije maintains roads while Koridori focuses on construction planning and project management, including expropriation of land.

The government said the merger will contribute to faster completion of projects such as stretches of Europe’s Corridor 10 and Corridor 11 road networks and hopefully reduce construction costs by around 20%.

Corridor 10 is a major pan-European transport corridor under construction that runs south from Salzburg in Austria to Hungary, Slovenia, Croatia, Serbia, Bulgaria, Macedonia and finally to the north-eastern Greek port of Thessalonica.

The east-west Corridor 11 connects Timisoara in Romania to the Serbian capital Belgrade and then runs south-west to end in the Montenegro port of Bar, a major port for ferries across the southern Adriatic to the Italian port of Bari.

In January this year in Belgrade, Serbia’s Minister of Construction Velimir Ilic signed a memorandum of cooperation with GIDC, a joint venture between the Serbian government and Global Capital Advisors Management from the United Arab Emirate. GIDC is advising on the financial aspects of constructing Corridor 11 from western Serbia to the border with Montenegro.

Putevi Srbije’s reputation suffered a significant downturn last year when workers from 26 major construction companies downed tools in a strike demanding the state company pay owed wages. Unions claimed that Putevi Srbije Putevi The union claimed the state owed road construction companies around $98 million, according to a report at the time by %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal Serbia&#8217;s national news agency Tanjug Visit : www.b92.net/eng/news page false http://www.b92.net/eng/news/society.php?yyyy=2013&amp;mm=06&amp;dd=26&amp;nav_id=86755 false false%>.

For more information on companies in this article

Related Content

  • Sophisticated camera system
    January 28, 2013
    Paris-based Arcure has developed the sophisticated Blaxtair safety camera system for use with off-highway equipment to reduce risks for site personnel. This camera helps detect obstacles, locate them precisely and identify them. Highly sophisticated, the Blaxtair unit can distinguish pedestrians from other objects in real time. When a pedestrian is detected in the danger zone, Blaxtair emits a sonic alarm to the driver that increases with the imminence of the danger. A control screen in the cabin allows the
  • More efficient ground stabilisation with the Allu 3D Positioning System
    January 6, 2017
    The Allu 3D Positioning System will make ground stabilisation works more efficient and more cost-effective, according to the Finnish manufacturer. The GPS-guided system works in conjunction with Allu’s PMX mixing head, which is mounted on an excavator. It is made up from four modules – computer unit with software, touch screen, base station and GPS antennas positioned on the mixing unit. Often used in road construction to firm up soft ground, the ground stabilisation process sees the binder material fed in
  • More efficient ground stabilisation with the Allu 3D Positioning System
    April 19, 2013
    The Allu 3D Positioning System will make ground stabilisation works more efficient and more cost-effective, according to the Finnish manufacturer. The GPS-guided system works in conjunction with Allu’s PMX mixing head, which is mounted on an excavator. It is made up from four modules – computer unit with software, touch screen, base station and GPS antennas positioned on the mixing unit. Often used in road construction to firm up soft ground, the ground stabilisation process sees the binder material fed in
  • Losing your car ain’t as hard as you would think
    April 29, 2015
    Thankfully it doesn’t happen too often, but forgetting where you parked your car can be an embarrassing moment, or several days, as one man in the UK recently found. Jason Matthews, 40, ran the Manchester City Marathon on April 19 in five hours and 11 minutes and then spent an additional several hours looking for his Saab 93 Sport. He said he couldn’t recall where he had parked the vehicle. He walked back around some of the 26-mile – nearly 42km - course, before driving around in a taxi for 40 minutes an