Skip to main content

Serbia approves merger of Koridori Srbije and Putevi Srbije

Serbia’s Ministry of Construction, Transport and Infrastructure has approved a merger between the public-owned roads companies Putevi Srbije (Roads of Serbia) and Koridori Srbije (Corridors of Serbia). Putevi Srbije maintains roads while Koridori focuses on construction planning and project management, including expropriation of land. The government said the merger will contribute to faster completion of projects such as stretches of Europe’s Corridor 10 and Corridor 11 road networks and hopefully red
November 25, 2014 Read time: 2 mins
Serbia’s Ministry of Construction, Transport and Infrastructure has approved a merger between the public-owned roads companies Putevi Srbije (Roads of Serbia) and 3235 Koridori Srbije (Corridors of Serbia).

Putevi Srbije maintains roads while Koridori focuses on construction planning and project management, including expropriation of land.

The government said the merger will contribute to faster completion of projects such as stretches of Europe’s Corridor 10 and Corridor 11 road networks and hopefully reduce construction costs by around 20%.

Corridor 10 is a major pan-European transport corridor under construction that runs south from Salzburg in Austria to Hungary, Slovenia, Croatia, Serbia, Bulgaria, Macedonia and finally to the north-eastern Greek port of Thessalonica.

The east-west Corridor 11 connects Timisoara in Romania to the Serbian capital Belgrade and then runs south-west to end in the Montenegro port of Bar, a major port for ferries across the southern Adriatic to the Italian port of Bari.

In January this year in Belgrade, Serbia’s Minister of Construction Velimir Ilic signed a memorandum of cooperation with GIDC, a joint venture between the Serbian government and Global Capital Advisors Management from the United Arab Emirate. GIDC is advising on the financial aspects of constructing Corridor 11 from western Serbia to the border with Montenegro.

Putevi Srbije’s reputation suffered a significant downturn last year when workers from 26 major construction companies downed tools in a strike demanding the state company pay owed wages. Unions claimed that Putevi Srbije Putevi The union claimed the state owed road construction companies around $98 million, according to a report at the time by %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal Serbia&#8217;s national news agency Tanjug Visit : www.b92.net/eng/news page false http://www.b92.net/eng/news/society.php?yyyy=2013&amp;mm=06&amp;dd=26&amp;nav_id=86755 false false%>.

For more information on companies in this article

Related Content

  • EBRD mulls loan for Macedonian Corridor 8 work
    July 13, 2021
    The €110million (US$ 130.5 million) load would help construct a 10.7km section, including a tunnel, between Bukojcani and Kicevo.
  • The European Union Road Federation (ERF) calls for EU Member States to prioritise road maintenance
    August 12, 2014
    The European Union Road Federation (ERF) has put out an “urgent” call for “EU Member States to prioritise road maintenance” as neglected surfaces continue to deteriorate and the potholes grow larger and larger. ERF wants the EU to “put alternative financing mechanisms into place” as soon as possible, to tackle what it sees as a growing road safety crisis across the region.
  • McKinsey to present major construction sector report at bauma
    March 3, 2016
    Consultancy McKinsey and Company will launch its report Perspectives on the Construction Equipment Industry in Europe during the upcoming bauma exhibition in Munich. The report will be presented at joint seminar with the CECE – Committee for European Construction Equipment – in the bauma fairgrounds on April 13 when leading McKinsey analysts and CECE officials discuss main trends and challenges facing manufactures and buyers of equipment.
  • Hidromek adds long-reach excavators
    January 6, 2017
    Hidromek has added long-reach options for three of its excavators – the HMK220LC, HMK300LC and the HMK370LC. Aimed at special earthmoving and drainage applications, the excavators carry LR branding and have ground level reach of 15.06, 18.19 and 16.6m respectively. Load over heights range from 10.85m with the HMK220LC LR to 12.59 with the HMK300LC LR. The long-reach HMK220LC delivers 7,300kgf of bucket digging force with a 0.45m3 bucket, with the figures rising to 1m3 and 11,400kgf with the HMK370LC LR.