Skip to main content

Serbia and China discuss Preljina-Boljare section of Corridor XI

Serbia is in talks with China for construction of the Preljina - Boljare section of the pan-European Corridor XI. The section will connect Corridor XI to Corridor X. Corridor XI will run from the Montenegrin port of Bar to Belgrade and on to Bucharest, Romania. Corridor X links Salzburg, Austria, with the Greek Aegean port of Thessaloniki port, via Croatia, Slovenia, Serbia and Macedonia. This includes the construction of a motorway bypass of Belgrade.
September 4, 2017 Read time: 1 min

Serbia is in talks with China for construction of the Preljina - Boljare section of the pan-European Corridor XI.

The section will connect Corridor XI to Corridor X. Corridor XI will run from the Montenegrin port of Bar to Belgrade and on to Bucharest, Romania.

Corridor X links Salzburg, Austria, with the Greek Aegean port of Thessaloniki port, via Croatia, Slovenia, Serbia and Macedonia. This includes the construction of a motorway bypass of Belgrade.

Related Content

  • Romania’s €7.6 billion transport infrastructure boost
    September 11, 2024
    Romania is investing €7.6 billion in developing its transport infrastructure.
  • New Zezelj’s Bridge in Novi Sad symbolises brotherhood and unity
    September 7, 2018
    The new Bridge of Brotherhood and Unity, also known as Zezelj’s Bridge, across the Danube River in Novi Sad, Serbia, is officially open. The road and rail tied-arch bridge replaces the original bridge of the same name that was built in 1961, named after the designer Branko Zezelj. The designer of the new bridge is Aleksandar Bojović and the contractor was an international consortium of Azvi, Taddei and Horta Coslada. One of the two arches is 177m long and 34m high and the other is 219m long and 42m high.
  • Czech tenders for section of D11, part of the E67 Via Baltica
    July 15, 2016
    The Czech road management company RSD is seeking a contractor for construction of 15km of the D11 motorway between Hradec Kralove and Smirice. Both towns are in northern Czech Republic, near the Polish border. The work is worth around €218.3 million, according to Czech media, and is one of the last remaining sections of the D11 to be built. Construction of another section between the town of Trutnov and the border with Poland is likely to start in 2019 and the Jaromer-Trutnov section after 2020.
  • Romanian road approval given
    February 10, 2022
    Approval has been given for a major Romanian road project.