Skip to main content

Serbia and China discuss Preljina-Boljare section of Corridor XI

Serbia is in talks with China for construction of the Preljina - Boljare section of the pan-European Corridor XI. The section will connect Corridor XI to Corridor X. Corridor XI will run from the Montenegrin port of Bar to Belgrade and on to Bucharest, Romania. Corridor X links Salzburg, Austria, with the Greek Aegean port of Thessaloniki port, via Croatia, Slovenia, Serbia and Macedonia. This includes the construction of a motorway bypass of Belgrade.
September 4, 2017 Read time: 1 min

Serbia is in talks with China for construction of the Preljina - Boljare section of the pan-European Corridor XI.

The section will connect Corridor XI to Corridor X. Corridor XI will run from the Montenegrin port of Bar to Belgrade and on to Bucharest, Romania.

Corridor X links Salzburg, Austria, with the Greek Aegean port of Thessaloniki port, via Croatia, Slovenia, Serbia and Macedonia. This includes the construction of a motorway bypass of Belgrade.

Related Content

  • Black sea countries complete preparations for implementation of Black Sea Ring project
    August 23, 2016
    The Black Sea Ring Road project will improve transport connections for the region - Eugene Gerden writes. Russia has officially started implementation of a project, known as the Black Sea Ring Road, which involves building a four-lane highway system connecting the countries surrounding the Black Sea. The Black Sea Ring Road is a substantial project, a highway measuring some 7,140km in all. Among the countries participating in the project are Turkey, Georgia, Russia, Ukraine, Moldova, Romania, Greece and
  • EAPA’s data shows Europe’s asphalt use in 2022
    February 20, 2024
    EAPA’s latest data reveals a picture of Europe’s asphalt use in 2022.
  • Progress on Serbia’s Zezeljev bridge replacement is slow
    August 30, 2017
    Construction of the Zezeljev rail and road bridge across the Danube River is facing further delays, according to the Serbian government. Work on the 470m-long new bridge was supposed to be finished by this month. But national elections and changes of government have hampered progress, Serbian media have reported. The original bridge was completed in 1961 as a single-track railway line and separate roadway between the cities of Novi Sad and Petrovaradin. NATO attacked the structure five times during its camp
  • Poland: Rubau Polska makes lowest bid in S61Via Baltica tender
    August 11, 2017
    Poland’s road authority GDDKiA said that five groups have tendered for construction of a 17.5km section of the S61 Expressway. The section runs from Podborze junction to Sniadowo junction and all bids fall within the investor's budget of around €146 million. The lowest offer reportedly was from a Rubau Polska consortium, at around €112 million, while the highest bid was lodged by Budimex at around €139 million.