Skip to main content

Serbia and China discuss Preljina-Boljare section of Corridor XI

Serbia is in talks with China for construction of the Preljina - Boljare section of the pan-European Corridor XI. The section will connect Corridor XI to Corridor X. Corridor XI will run from the Montenegrin port of Bar to Belgrade and on to Bucharest, Romania. Corridor X links Salzburg, Austria, with the Greek Aegean port of Thessaloniki port, via Croatia, Slovenia, Serbia and Macedonia. This includes the construction of a motorway bypass of Belgrade.
September 4, 2017 Read time: 1 min

Serbia is in talks with China for construction of the Preljina - Boljare section of the pan-European Corridor XI.

The section will connect Corridor XI to Corridor X. Corridor XI will run from the Montenegrin port of Bar to Belgrade and on to Bucharest, Romania.

Corridor X links Salzburg, Austria, with the Greek Aegean port of Thessaloniki port, via Croatia, Slovenia, Serbia and Macedonia. This includes the construction of a motorway bypass of Belgrade.

Related Content

  • Bosnia-Croatia link discussed
    July 13, 2012
    Bosnia and Croatia are looking to discuss a new highway construction project to link the two countries. The Adriatic-Ionic section of the Corridor VC motorway looks likely to pass through Bosnia. The plan is to build a total of 110km of roads, out of the planned 336km on the Corridor VC, by 2012.
  • Work on Serbia’s Corridor 10 highway is on track
    April 3, 2014
    In Serbia work on the Corridor 10 highway looks set to be completed as planned in 2016. Serbian roads company, Koridori Srbije, says that that the Corridor 10 motorway should be completed by the middle of 2016. The World Bank (WB) mission visited building sites on Corridor 10 and said that considerable progress has been made, with an additional 23% of works having been carried out in the last 18 month period. In 2014 alone, 50km of the route will be completed. Work is being carried out on 238 bridges, out o
  • New Macedonia highway section opening
    April 30, 2018
    A new highway stretch measuring 28km long is opening in Macedonia. The work has been carried out by the Greek contractor Aktor. The project has cost €227 million. The new highway section runs from Demir Kapija to Smokvica. Financing has been provided jointly by the European Bank for Reconstruction and Development (EBRD), the European Investment Bank (EIB), a number of funds and also by Macedonia’s own budget. The completion of this section of highway now completes the route connecting the north and south of
  • Serbia sets €7.12 billion transport budget
    February 2, 2024
    Serbia is setting a €7.12 billion transport budget.