Skip to main content

Second bascule bridge for Lowestoft

Total cost of the North Sea coastal project is around €160 million.
By David Arminas December 10, 2020 Read time: 2 mins
Lowestoft’s planned Gull Wing Bridge, the town's second bascule crossing of Lake Lothing (image courtesy Suffolk County Council)

The town of Lowestoft on England’s North Sea coast will get a €138 million second bascule bridge as a third crossing over Lake Lothing.

The original cost was estimated at €101 million, including €81 million from the UK’s Department for Transport and €20.3 million in local contributions of which around €11.1 million is from Suffolk County Council.

According to a report by the BBC, the new estimated construction cost is €138 million plus a further €21 million to provide "an emergency pot of money should any unforeseen issues arise and caters for any further complications caused by coronavirus".

Work on the bridge, called the Gull Wing Bridge, is expected to start early next year with opening in summer 2023. Farrans was recently appointed by tender as the main contractor. But preliminary work is underway, with Suffolk-based company Archaeological Solutions digging trial trenches at the site.

Jonny Kerr, operations director for the civil engineering division of Farrans, said the project “is going to mean a great deal to the local community” through hiring of local workers and by using a local supply chain as much as possible.

Lowestoft, population of around 72,000, is about 180km north-east of London and on the North Sea coast. Lake Lothing is a saltwater lake and forms part of the Port of Lowestoft. It is bridged in the centre of town by an existing bascule bridge and further out in the marshland area called Oulton Broad by a vertical lift bridge and a rail swing bridge.

The existing bascule bridge, called A47 bascule bridge, is 47years old and is part of the trunk route A47. The bridge links north and south Lowestoft with around 14,000 vehicles using the crossing daily and it allows ships access into Lowestoft harbour. It had repairs costing £230,000 to the lifting mechanism in 2018.

For more information on companies in this article

Related Content

  • New bridge link for Oregon-Washington
    April 25, 2012
    The US Department of Transportation has given the go-ahead for the I-5 Columbia River Crossing project, which will link Washington and Oregon states. The plans involve replacing the existing Interstate 5 Columbia River Crossing Bridges and building a new interstate transit link.
  • Golden route to success
    July 20, 2012
    Built in 1937 and still the ninth longest suspension bridge in the world, the Golden Gate Bridge across San Francisco Bay remains in fine shape despite its age - Andrew Bardin Williams writes The Golden Gate Bridge turned 75 years old on May 27 and continues to play a key role in the transportation, engineering, construction and ITS communities. The structure has played an important historical role, an engineering success that boosted the economy of the region. And it also led the way as the first major pub
  • Progress for Stonehenge Tunnel bypass project
    April 6, 2020
    Progress is being seen with the planned Stonehenge Tunnel bypass project.
  • Hail! Roman Watling Street section unearthed!
    November 15, 2024
    The very well preserved section of the old Roman Watling Street near London, UK, is the first physical proof that parts of the 2,000-year-old route survive directly beneath its modern counterpart, Old Kent Road.