Skip to main content

Second bascule bridge for Lowestoft

Total cost of the North Sea coastal project is around €160 million.
By David Arminas December 10, 2020 Read time: 2 mins
Lowestoft’s planned Gull Wing Bridge, the town's second bascule crossing of Lake Lothing (image courtesy Suffolk County Council)

The town of Lowestoft on England’s North Sea coast will get a €138 million second bascule bridge as a third crossing over Lake Lothing.

The original cost was estimated at €101 million, including €81 million from the UK’s Department for Transport and €20.3 million in local contributions of which around €11.1 million is from Suffolk County Council.

According to a report by the BBC, the new estimated construction cost is €138 million plus a further €21 million to provide "an emergency pot of money should any unforeseen issues arise and caters for any further complications caused by coronavirus".

Work on the bridge, called the Gull Wing Bridge, is expected to start early next year with opening in summer 2023. Farrans was recently appointed by tender as the main contractor. But preliminary work is underway, with Suffolk-based company Archaeological Solutions digging trial trenches at the site.

Jonny Kerr, operations director for the civil engineering division of Farrans, said the project “is going to mean a great deal to the local community” through hiring of local workers and by using a local supply chain as much as possible.

Lowestoft, population of around 72,000, is about 180km north-east of London and on the North Sea coast. Lake Lothing is a saltwater lake and forms part of the Port of Lowestoft. It is bridged in the centre of town by an existing bascule bridge and further out in the marshland area called Oulton Broad by a vertical lift bridge and a rail swing bridge.

The existing bascule bridge, called A47 bascule bridge, is 47years old and is part of the trunk route A47. The bridge links north and south Lowestoft with around 14,000 vehicles using the crossing daily and it allows ships access into Lowestoft harbour. It had repairs costing £230,000 to the lifting mechanism in 2018.

For more information on companies in this article

Related Content

  • LiuGong opens factory in Mogi Guaçu, Brazil
    April 9, 2015
    LiuGong Machinery, a major Chinese maker of heavy construction equipment, said it will invest around US$38 million in manufacturing in Brazil. The announcement was made during the opening ceremony of its first factory in Brazil, in the city of Mogi Guaçu, around 180km from São Paulo. LiuGong expects to produce 1,500 wheel loaders and excavators annually at the facility in the first three years of operation.
  • Closer ties with Highways England Collaborative Delivery Framework
    April 13, 2017
    Highways England is reconsidering its procurement to encourage innovation and ultimately deliver more for less. Kristina Smith spoke to client, contractors and material suppliers to find out more. A group of senior managers is being addressed by a local resident who lives close to some proposed road works. The resident is angry, persistent and quite rude. The question is: how will these managers respond?
  • Costain lands major A160 UK road contract
    July 22, 2013
    Costain has won an Early Contractor Involvement (ECI) contract to improve the A160, from the junction with the A180 at Brocklesby Interchange to the Port of Immingham, near Grimsby, north Lincolnshire, England. The project design aims to reduce traffic congestion and improve journey time reliability to meet the needs of current traffic flows and predicted growth in traffic resulting from existing and future developments. The project also seeks to improve safety for road users and the local community. Works
  • Norway considers wooden bridge across Lake Mjosa
    May 12, 2017
    Norway could be home to the world’s longest wooden bridge if the government gives the go-ahead for a span across Lake Mjosa. In a new report, researchers conclude that it is possible, both technically and economically, to build a 1.7km wooden bridge between the towns Biri and Moelv. Importantly, the report notes that construction cost differences between a wooden and concrete structure would be little. Estimates for a wooden bridge are around €420 million while for a concrete structure would come in about €