Skip to main content

Second bascule bridge for Lowestoft

Total cost of the North Sea coastal project is around €160 million.
By David Arminas December 10, 2020 Read time: 2 mins
Lowestoft’s planned Gull Wing Bridge, the town's second bascule crossing of Lake Lothing (image courtesy Suffolk County Council)

The town of Lowestoft on England’s North Sea coast will get a €138 million second bascule bridge as a third crossing over Lake Lothing.

The original cost was estimated at €101 million, including €81 million from the UK’s Department for Transport and €20.3 million in local contributions of which around €11.1 million is from Suffolk County Council.

According to a report by the BBC, the new estimated construction cost is €138 million plus a further €21 million to provide "an emergency pot of money should any unforeseen issues arise and caters for any further complications caused by coronavirus".

Work on the bridge, called the Gull Wing Bridge, is expected to start early next year with opening in summer 2023. Farrans was recently appointed by tender as the main contractor. But preliminary work is underway, with Suffolk-based company Archaeological Solutions digging trial trenches at the site.

Jonny Kerr, operations director for the civil engineering division of Farrans, said the project “is going to mean a great deal to the local community” through hiring of local workers and by using a local supply chain as much as possible.

Lowestoft, population of around 72,000, is about 180km north-east of London and on the North Sea coast. Lake Lothing is a saltwater lake and forms part of the Port of Lowestoft. It is bridged in the centre of town by an existing bascule bridge and further out in the marshland area called Oulton Broad by a vertical lift bridge and a rail swing bridge.

The existing bascule bridge, called A47 bascule bridge, is 47years old and is part of the trunk route A47. The bridge links north and south Lowestoft with around 14,000 vehicles using the crossing daily and it allows ships access into Lowestoft harbour. It had repairs costing £230,000 to the lifting mechanism in 2018.

For more information on companies in this article

Related Content

  • Komarno bridge on schedule despite cost and environmental protests
    July 13, 2018
    Slovakia’s transport minister said he will do everything possible to finish on time a new bridge connecting Komano with the Hungarian town of Komarom. Construction started last year on the €117 million bridge over the Danube River between the Hungarian town of Komarom and the Slovak town of Komarno. Around 85% of the cost of the bridge - designed by Hungarian engineering firm Pont-Terv - will be covered by European Union’s Connecting Europe Facility. Completion is planned for winter 2019. Transport m
  • Komarno bridge on schedule despite cost and environmental protests
    July 13, 2018
    Slovakia’s transport minister said he will do everything possible to finish on time a new bridge connecting Komano with the Hungarian town of Komarom. Construction started last year on the €117 million bridge over the Danube River between the Hungarian town of Komarom and the Slovak town of Komarno. Around 85% of the cost of the bridge - designed by Hungarian engineering firm Pont-Terv - will be covered by European Union’s Connecting Europe Facility. Completion is planned for winter 2019. Transport m
  • Tunnels - an environmentally attractive option?
    February 21, 2012
    While tunnels are often more expensive than bridges, they can offer environmentally attractive options for transport schemes. Tunnels offer environmentally attractive options for a range of transport infrastructure schemes, but in many cases high construction costs may restrict their use.
  • England’s new Sunderland Bridge renamed Northern Spire
    December 12, 2017
    The new Sunderland Bridge - on track to open in the spring - was officially named Northern Spire during a recent event on the bridge. The official naming followed a week-long public vote in which 10,000 people chose their favourite name from an official list of three names. Northern Spire received almost half of the votes, according to bridge officials. The other names were Lumen Point (34% of votes) and The Prism which received 17%. The two-span cable-stayed bridge across the River Wear in northeast