Skip to main content

Second bascule bridge for Lowestoft

Total cost of the North Sea coastal project is around €160 million.
By David Arminas December 10, 2020 Read time: 2 mins
Lowestoft’s planned Gull Wing Bridge, the town's second bascule crossing of Lake Lothing (image courtesy Suffolk County Council)

The town of Lowestoft on England’s North Sea coast will get a €138 million second bascule bridge as a third crossing over Lake Lothing.

The original cost was estimated at €101 million, including €81 million from the UK’s Department for Transport and €20.3 million in local contributions of which around €11.1 million is from Suffolk County Council.

According to a report by the BBC, the new estimated construction cost is €138 million plus a further €21 million to provide "an emergency pot of money should any unforeseen issues arise and caters for any further complications caused by coronavirus".

Work on the bridge, called the Gull Wing Bridge, is expected to start early next year with opening in summer 2023. Farrans was recently appointed by tender as the main contractor. But preliminary work is underway, with Suffolk-based company Archaeological Solutions digging trial trenches at the site.

Jonny Kerr, operations director for the civil engineering division of Farrans, said the project “is going to mean a great deal to the local community” through hiring of local workers and by using a local supply chain as much as possible.

Lowestoft, population of around 72,000, is about 180km north-east of London and on the North Sea coast. Lake Lothing is a saltwater lake and forms part of the Port of Lowestoft. It is bridged in the centre of town by an existing bascule bridge and further out in the marshland area called Oulton Broad by a vertical lift bridge and a rail swing bridge.

The existing bascule bridge, called A47 bascule bridge, is 47years old and is part of the trunk route A47. The bridge links north and south Lowestoft with around 14,000 vehicles using the crossing daily and it allows ships access into Lowestoft harbour. It had repairs costing £230,000 to the lifting mechanism in 2018.

For more information on companies in this article

Related Content

  • Denmark eyes Little Belt Fixed Link
    November 8, 2023
    The directorate is concerned that the so-called New Little Bridge, which opened in 1970, will suffer severe traffic congestion from 2030 onwards.
  • Czech Republic: bad bridges report
    March 6, 2018
    The Czech government’s road and motorway directorate RSD has reported that thousands of bridges in the country are in a critical state. Nearly 10% or the 5,000 motorway or first-class road bridges are in bad, very bad or emergency condition. The same applies to almost 3,000 bridges on second- and third-class roads. RSD has allocated around €69 million for repairs of bridges at main roads and motorways this year
  • Terex cranes in a tight spot in Michigan
    February 6, 2017
    Terex cranes have been involved in a multiple bridge repair project in the US More than 96,000 vehicles per day travel a stretch of I-96, including its 52-year-old bridges. The Michigan Department of Transportation is in the midst of a two-year US$77 million project to repair bridges and relieve increasing congestion along Interstate 96 at the U.S. Highway 23 interchange in Livingston County. Toebe Construction along with joint venture partner Kamminga & Roodvoets are bringing in a lot of lifting powe
  • King is queen of cone laying
    December 9, 2021
    A second automated cone-laying vehicle, this time from King Highway, is completing off-road trials with England’s National Highways agency.