Skip to main content

Second bascule bridge for Lowestoft

Total cost of the North Sea coastal project is around €160 million.
By David Arminas December 10, 2020 Read time: 2 mins
Lowestoft’s planned Gull Wing Bridge, the town's second bascule crossing of Lake Lothing (image courtesy Suffolk County Council)

The town of Lowestoft on England’s North Sea coast will get a €138 million second bascule bridge as a third crossing over Lake Lothing.

The original cost was estimated at €101 million, including €81 million from the UK’s Department for Transport and €20.3 million in local contributions of which around €11.1 million is from Suffolk County Council.

According to a report by the BBC, the new estimated construction cost is €138 million plus a further €21 million to provide "an emergency pot of money should any unforeseen issues arise and caters for any further complications caused by coronavirus".

Work on the bridge, called the Gull Wing Bridge, is expected to start early next year with opening in summer 2023. Farrans was recently appointed by tender as the main contractor. But preliminary work is underway, with Suffolk-based company Archaeological Solutions digging trial trenches at the site.

Jonny Kerr, operations director for the civil engineering division of Farrans, said the project “is going to mean a great deal to the local community” through hiring of local workers and by using a local supply chain as much as possible.

Lowestoft, population of around 72,000, is about 180km north-east of London and on the North Sea coast. Lake Lothing is a saltwater lake and forms part of the Port of Lowestoft. It is bridged in the centre of town by an existing bascule bridge and further out in the marshland area called Oulton Broad by a vertical lift bridge and a rail swing bridge.

The existing bascule bridge, called A47 bascule bridge, is 47years old and is part of the trunk route A47. The bridge links north and south Lowestoft with around 14,000 vehicles using the crossing daily and it allows ships access into Lowestoft harbour. It had repairs costing £230,000 to the lifting mechanism in 2018.

For more information on companies in this article

Related Content

  • Economic gains from widening the A453 in Nottingham, England
    August 12, 2014
    Work is well underway on turning a busy just over 11km two-lane link road from the city of Nottingham to Junction 24 of the M1 in Leicestershire, England into a four-lane highway. The widened highway will relieve considerable peak-time congestion for travellers to Nottingham, the M1 and East Midlands Airport while also making journeys safer and more reliable. Guy Woodford reports Used by up to 30,000 vehicles a day, the A453 is renowned for congestion at peak travel times. But years of day-to-day commuter a
  • Highways England starts moving on projects for the eastern region
    September 30, 2015
    Highways England has met suppliers and stakeholders to discuss how it will spend more than €2.7 billion to improve roads across the East of England region in the next six years. The work is part of the government’s Road Investment Strategy to triple levels of spending on England’s roads by the end of the decade. Plans include major improvements on the M11, A5 and M1, A1(M), A12, A14, A47 and A428. Roads minister Andrew Jones said the investment is the largest in a generation.
  • Australian road maintenance needs an immediate $3.78 billion boost
    July 4, 2014
    The Australian National Road and Motorists Association (NRMA) has published a report highlighting a widening gap in national funds available for road maintenance, a gap which the motoring group says has already reached Aus $3.78 billion. The association is calling on the Federal Government to allocate more fuel excise revenue to road projects, saying up to half of the current 38.1 cents per litre is required to fund the ‘black hole’.
  • Second Tees Valley Viaduct proposed at Middlesbrough
    March 19, 2019
    Proposals for a second crossing over the Tees River in northern England have gone out to public consultation, according to media reports. The Tees Valley Combined Authority, the local authority, said there are two options to take the A19 trunk road over the River Tees at the city of Middlesbrough. One plan, costing between €235-292 million, would be for a bridge parallel to the existing one where each bridge would traffic in only one directions. The other option is for a four-lane €350 million brid