Skip to main content

Seattle’s Alaskan Way tolls to be kept to a minimum

Drivers could pay as little as US$1 to use Seattle’s 2.7km Alaskan Way tunnel when it opens, likely by the end of the year. The Washington State Department of Transportation, owner of the tunnel, are considering several rates depending on time of day and day of week, according to local media. The DoT said funding for the $3.2 billion viaduct replacement programme comes from state, federal and local sources as well as the Port of Seattle and tolls on drivers using the tunnel. The money will fund tunnel
June 4, 2018 Read time: 2 mins
Low tolls take high priority on Seattle’s soon-to-be-open tunnel replacement for the Alaskan Way viaduct
Drivers could pay as little as US$1 to use Seattle’s 2.7km Alaskan Way tunnel when it opens, likely by the end of the year.

The Washington State Transportation Commission, owner of the tunnel, is considering several rates depending on time of day and day of week, according to local media.

The DoT said funding for the $3.2 billion viaduct replacement programme comes from state, federal and local sources as well as the Port of Seattle and tolls on drivers using the tunnel. The money will fund tunnel maintenance and raise $200 million to repay construction bonds used to build the tunnel.

“State transportation commissioners are intent on charging the lowest possible tolls for the Highway 99 tunnel, so motorists won’t be tempted to divert onto busy downtown Seattle streets,” the WSTC has said.

One option would be to set four rates ranging from $1 on weekends and $1.50 at morning peaks to $2.25 each direction during afternoon rush hour. After the first two years, tolls would increase 3% annually from 2021 to 2025.

Rates are much higher only several kilometres away from the tunnel where drivers pay express-lane tolls as high as $10 to save 20 to 25 minutes along I-405, the Seatle Times reported.

The five tolls on the Highway 520 floating toll bridge alternate through 11 time periods per weekday, ranging from $1.25 to $4.30, with minimal controversy, the Times reported.

Related Content

  • Moveable barrier cuts costs, aids motorists
    February 20, 2012
    Work on an award-winning US bridge was completed with savings and benefits to motorists through the help of an innovative barrier. The bridge replacement of US 31 over I-465 and Lick Creek in southern Indianapolis, state capital of Indiana, won the 2011 Honor Award from the American Council of Engineering Companies of Indiana. Stephen J. Christian & Associates of Indianapolis completed the design in less than nine months to allow Indiana Department of Transportation (INDOT) to take advantage of the favourab
  • TISPOL 2017: Europe’s road safety record suffers as austerity bites hard
    December 21, 2017
    Police budgets are being slashed, staff numbers are falling and Europe’s long-term trend towards ever-fewer road deaths has ground to a halt. Does Europe’s road network face a far more dangerous future? Geoff Hadwick reports from TISPOL 2017 in Manchester, UK. Europe’s road safety record is under threat. Lower and lower funding levels have become a very serious, and very worrying, problem for the EU’s traffic police bosses. They know that they must find new ways to focus road users on changing their beha
  • Help is on the way: RoadResource.org
    November 29, 2018
    RoadResource.org as a go-to website for surfacing information is now live, explains Doug Hogue, of VSS Macropaver When RoadResouce.org went live – quietly - in July it was the end of two years of hard work by three US associations for pavement preservation. But there was no grand party or ceremonial pushing of the “go live” button, says Doug Hogue, vice president and general manager of VSS Macropaver. “For all of us in the industry July is a busy period that left little time to celebrate on the ope
  • RiverLinx consortium inks London’s Silvertown Tunnel deal
    November 27, 2019
    The RiverLinx consortium has reached financial close on the €1.17 billion Silvertown Tunnel project after a three-year procurement process by the client Transport for London.