Skip to main content

Seattle’s Alaskan Way tolls to be kept to a minimum

Drivers could pay as little as US$1 to use Seattle’s 2.7km Alaskan Way tunnel when it opens, likely by the end of the year. The Washington State Department of Transportation, owner of the tunnel, are considering several rates depending on time of day and day of week, according to local media. The DoT said funding for the $3.2 billion viaduct replacement programme comes from state, federal and local sources as well as the Port of Seattle and tolls on drivers using the tunnel. The money will fund tunnel
June 4, 2018 Read time: 2 mins
Low tolls take high priority on Seattle’s soon-to-be-open tunnel replacement for the Alaskan Way viaduct
Drivers could pay as little as US$1 to use Seattle’s 2.7km Alaskan Way tunnel when it opens, likely by the end of the year.

The Washington State Transportation Commission, owner of the tunnel, is considering several rates depending on time of day and day of week, according to local media.

The DoT said funding for the $3.2 billion viaduct replacement programme comes from state, federal and local sources as well as the Port of Seattle and tolls on drivers using the tunnel. The money will fund tunnel maintenance and raise $200 million to repay construction bonds used to build the tunnel.

“State transportation commissioners are intent on charging the lowest possible tolls for the Highway 99 tunnel, so motorists won’t be tempted to divert onto busy downtown Seattle streets,” the WSTC has said.

One option would be to set four rates ranging from $1 on weekends and $1.50 at morning peaks to $2.25 each direction during afternoon rush hour. After the first two years, tolls would increase 3% annually from 2021 to 2025.

Rates are much higher only several kilometres away from the tunnel where drivers pay express-lane tolls as high as $10 to save 20 to 25 minutes along I-405, the Seatle Times reported.

The five tolls on the Highway 520 floating toll bridge alternate through 11 time periods per weekday, ranging from $1.25 to $4.30, with minimal controversy, the Times reported.

Related Content

  • Europe closes in on the crossings
    September 27, 2017
    The Mersey Gateway bridge project off England’s west coast passed a milestone recently with the first joining of two of the deck sections. The key segments, as the sections are called, link the north approach viaduct to the north pylon deck span and are the first of four deck-joins scheduled for this summer. In total, there are five sections of bridge deck and approach roads that need to be joined.
  • $250 million for Oregon-Washington bridge replacement
    July 10, 2025
    Oregon and Washington will provide $250 million for the Hood River-White Salmon Bridge replacement.
  • New fuel economy targets could cut motoring costs in Europe
    May 18, 2012
    Europe’s drivers will be able to save enormous sums of money if ambitious fuel economy targets are introduced by the EU this July. This claim has been made by a former UK Environment Agency chief, Malcolm Fergusson. His study predicts that annual fuel costs for Europe’s drivers could fall by about 23% by 2020 if the currently expected EU fuel efficiency target of 95grammes of CO2 emissions/km for new cars and 147grammes/km for vans is confirmed by the European Commission in July, as expected. If the target
  • US president-elect Obama and the future of America's roads
    July 18, 2012
    The current US transportation funding law expires in September 2009. The current law allocates US$286 billion to highway and transportation projects. However, simply re-authorising the same amount will not be sufficient to build, maintain and improve the nation's roads, bridges, airports, and other deteriorating infrastructure. The backlog of projects unaddressed has swollen to the point where the American Society of Civil Engineers (ASCE) says it will take $1.6 trillion to address the country's road and in