Skip to main content

Seattle bridge repairs required

Major repairs are required for the West Seattle Bridge.
By MJ Woof August 24, 2020 Read time: 1 min
Costly repairs are needed to the West Seattle Bridge – image courtesy © Mariana Ianovska, Dreamstime.com

Major repair work is needed for the West Seattle Bridge. Estimates suggest that the necessary work could cost from US$160-$225 million.

Seattle Department of Transportation (SDOT) is securing the financing required for the work. Funding is being sourced from the city’s budget as well as from loans.

The cracking in the bridge, which opened to traffic in 1984, appears to have been caused by a number of factors. The bridge carries more traffic and more heavy trucks than it was originally designed for and an extra lane was added some years ago. The bridge also suffered from a jammed bearing, as well as coping with an earthquake and creep in its concrete structure, resulting in a reduction of tension in the steel reinforcement.

Related Content

  • El Sillar – Bolivia’s challenging road project
    February 6, 2020
    Construction of Bolivia’s El Sillar highway, the country’s most complicated road project – Mauro Nogarin reports
  • Geosynthetics give extra strength to soil reinforcement
    March 14, 2012
    Using geosynthetics for soil reinforcement is highly effective but requires a high quality and trusted geogrid. When it comes to deciding which geogrid is best for a specific project, a number of product parameters must be taken into account. In the design of steep slopes, the most important parameter is the available long term design strength (Pdes). Recently, Colbond has significantly increased this factor for its high performance Enkagrid product, recognised with a newly updated BBA (British Board of Ag
  • Geosynthetics give extra strength to soil reinforcement
    May 3, 2012
    Using geosynthetics for soil reinforcement is highly effective but requires a high quality and trusted geogrid. When it comes to deciding which geogrid is best for a specific project, a number of product parameters must be taken into account. In the design of steep slopes, the most important parameter is the available long term design strength (Pdes). Recently, Colbond has significantly increased this factor for its high performance Enkagrid product, recognised with a newly updated BBA (British Board of Ag
  • New bridge proposed for Mobile Bay, Alabama
    May 19, 2022
    A new bridge link is proposed for Mobile Bay, Alabama.