Skip to main content

Seattle bridge repairs required

Major repairs are required for the West Seattle Bridge.
By MJ Woof August 24, 2020 Read time: 1 min
Costly repairs are needed to the West Seattle Bridge – image courtesy © Mariana Ianovska, Dreamstime.com

Major repair work is needed for the West Seattle Bridge. Estimates suggest that the necessary work could cost from US$160-$225 million.

Seattle Department of Transportation (SDOT) is securing the financing required for the work. Funding is being sourced from the city’s budget as well as from loans.

The cracking in the bridge, which opened to traffic in 1984, appears to have been caused by a number of factors. The bridge carries more traffic and more heavy trucks than it was originally designed for and an extra lane was added some years ago. The bridge also suffered from a jammed bearing, as well as coping with an earthquake and creep in its concrete structure, resulting in a reduction of tension in the steel reinforcement.

Related Content

  • Sunderland’s New Wear Crossing takes shape
    February 16, 2017
    The New Wear Crossing will be the first bridge to be built over the River Wear in Sunderland, UK, for more than 40 years Raising the bridge’s 100m-tall pylon promised to be a stunning visual sight, but also a tricky operation dictated by extremely variable local weather. World Highways went to press just before the operation, but not before the pylon had arrived by barge on January 7. It had completed a two-day crossing of the often unpredictable North Sea from the Belgian port of Ghent where it was f
  • New bridge works planned for the Philippines
    September 21, 2022
    Three new bridge links are planned for the Philippines.
  • Historic Oakland Bay Bridge receives a new asphalt road surface
    March 31, 2014
    Part of an iconic US bridge has been given a new lease of life, as Mike Woof reports The western section of the historic Oakland Bay Bridge in the US state of California has recently benefited from a series of improvements to strengthen its structural integrity and also upgrade the running surface. Contractor OC Jones & Sons of Berkeley CA, paved large portions of the bridge, taking on two different projects as part of the work. First was placement of the specialised epoxy on the self-anchored suspension (S
  • Latvia's bridges require urgent repair
    February 21, 2012
    A report into the state of Latvia’s bridges shows that one in three requires major works, with 100 requiring immediate repair.