Skip to main content

Russia: MISK wins tender for Yuzhnaya Rokada construction in Moscow

MISK wins tender for Moscow’s Yuzhnaya Rokada road The Moscow Engineering and Construction Company (MISK) has won the tender for construction of the second section of Moscow’s Southern lateral highway. MISK was the only contractors tendering for the contract, worth nearly US$74.3 million, for the section called Yuzhnaya Rokada. Details include construction of 5km of road, essential side lanes, more than 300m of overpasses and turnoffs. Work is expected to take nearly 20 months. The tender win co
September 22, 2015 Read time: 1 min
MISK wins tender for Moscow’s Yuzhnaya Rokada road

The Moscow Engineering and Construction Company (MISK) has won the tender for construction of the second section of Moscow’s Southern lateral highway.

MISK was the only contractors tendering for the contract, worth nearly US$74.3 million, for the section called Yuzhnaya Rokada. Details include construction of 5km of road, essential side lanes, more than 300m of overpasses and turnoffs.

Work is expected to take nearly 20 months.

The tender win comes after the government announced in April that it had set a budget of $1.11 billion for road construction, up from nearly $1.03 billion in 2014.

Related Content

  • Tender offer for Moscow – St Petersburg highway
    November 1, 2012
    Bidding is strong for work on a key section of the Moscow to St Petersburg highway. Several offers have been made for the project, which will connect the Businovskaya and MKAD junction to Festivalnaya Street, and a junction of Festivalnaya Street and MKAD. Both Mostotrest and ARKS are tendering for the work. The tender results will be announced on 20th November 2012. The authorities have stated that the contract price should not exceed US$946 million.
  • Poland: A1 tender attracts 11 offers, including one from Strabag
    February 19, 2015
    Construction of a 15.2km section of Poland’s A1 motorway has attracted 11 bids. A Strabag consortium made the lowest bid for the section, between Pyrzowice and Rzasawa, coming in at €146 million. A consortium formed by Polaqua and Dragados was the second lowest, at €156.4 million. The highest bid was €183.4 million. The contract calls for a construction period of 30 months. Meanwhile, the province of Mazowsze, or Masovia, with its 5.5 million inhabitants and the capital Warsaw, will get nearly €2.1 billion
  • Danish-German Fehmarn Belt road and rail tunnel hits funding snag
    July 9, 2015
    A Danish newspaper has learned of a significant European Union funding gap for one of Europe’s most ambitious transportation road and rail projects. The Fehmarn Belt Fixed Link would connect the German island of Fehmarn with the Danish island of Lolland. A submersed tunnel will cross the 18km-wide Fehmarn Belt, or Fehmarn Strait, in the Baltic Sea. Last February news emerged that contractors had revamped their cost estimates, adding nearly €1.2 billion to the project. This put the final cost of the 18
  • Work begins on Stockholm’s new bypass
    August 22, 2016
    The first tunnels are being excavated for the huge bypass tunnel in Sweden’s capital Stockholm – Adrian Greeman writes. After years of preparation and design, blasting and rock moving for Sweden's largest infrastructure project began south of the city this year. It sets in train a decade-long project that will create a new half-ring dual three-lane motorway for the city, 20km long. With most of it deep underground, it will also be one of Europe's largest ever road tunnels. The scheme is aimed at transformin