Skip to main content

Russia and Azerbaijan move closer to a new Samur River Bridge

Moscow-based infrastructure group Doraeroproekt Institute will design a bridge over the Samur River under an agreement between Russia and Azerbaijan. The new bridge will carry around 37,000 vehicles a day and link the two villages of Samur in Azerbaijan and the Russian village of Yarag-Kazmalar. The announcement follows the signing by the two governments of a bridge protocol in mid-2013 as part of other infrastructure project agreements. Azerbaijan will finance bridge construction and Russia will c
June 4, 2015 Read time: 2 mins
Moscow-based infrastructure group Doraeroproekt Institute will design a bridge over the Samur River under an agreement between Russia and Azerbaijan.

The new bridge will carry around 37,000 vehicles a day and link the two villages of Samur in Azerbaijan and the Russian village of Yarag-Kazmalar.

The announcement follows the signing by the two governments of a bridge protocol in mid-2013 as part of other infrastructure project agreements.

Azerbaijan will finance bridge construction and Russia will compensate Azerbaijan around half the cost, according to Azerbaijan media reports. No other details were given regarding construction, contract type or total coast.

The existing bridge on the Russia-Azerbaijan border will be renovated after the new bridge is completed.

The glacier-fed Caucasus Mountain river forms part of the Russia-Azerbaijan border near the Caspian Sea into which the Samur flows.

The town of Samur is itself the nearest village to the border point where Azerbaijan’s M1 highway crosses into Russia. The border crossing is the only legal road crossing between the two nations though there is also a railway crossing at Russian town of Yalama. Both are open to only citizens of the Russian Commonwealth, the Commonwealth of Independent States (CIS).

Related Content

  • Stantec: coming to an infrastructure site near you
    April 13, 2017
    Acquisitive Canadian firm Stantec is snapping up more transportation expertise as it moves out of its home North American market. David Arminas reports. Last December, politicians from the US states of Kentucky and Indiana celebrated the opening of the second of two major bridges. A ribbon-cutting ceremony took place in cold wintry weather on the new 762m-long cable-stayed Lewis and Clark Bridge. The event marked the finish of the prestigious three-and-half-year Ohio River Bridges Project.
  • Flatiron wins Steveston work in Canada
    April 18, 2022
    The Steveston Interchange project near Vancouver is key for improving traffic flow into what will be a new immersed Massey Tunnel under the Fraser River.
  • CT Ictas and Astaldi submit complaint over Peljeski Bridge award
    February 14, 2018
    Croatian media are reporting a dispute between two consortia and that of the China Road and Bridges over the Peljeski bridge project. Croatia’s national roads company Hrvatske Ceste chose China Road and Bridges but the decision is being challenged by a consortium led by the Italian firm Astaldi and one by Turkish CT Ictas. The two consortia submitted their complaints to the Croatian State Commission for Control of Public Ordering Processes in January only days after similar action by another consortia led
  • Transport development potential in Russia’s east
    September 13, 2019
    Eastern Russia holds considerable potential for the development of transport infrastructure projects.