Skip to main content

A rough ride for Denmark’s National Road Directorate

Denmark’s National Audit Office has criticised the Danish National Road Directorate for consistently miscalculating the level of investment required for road projects. The Road Directorate – Vejdirektoratet - used 33% less than budgeted for road projects from 2007-2017. The audit office said that "budget calculations by the transport ministry, including the Road Directorate, have not been accurate enough". Jens Holmboe, head of the Road Directorate, rejected the criticism, saying that the Audit Office
November 1, 2019 Read time: 2 mins
Denmark is not spending enough? (Roskilde Bridge, photo courtesy RBAI joint venture)
Denmark’s 5285 National Audit Office has criticised the Danish National Road Directorate for consistently miscalculating the level of investment required for road projects.


The Road Directorate – Vejdirektoratet - used 33% less than budgeted for road projects from 2007-2017. The audit office said that "budget calculations by the transport ministry, including the Road Directorate, have not been accurate enough".

Jens Holmboe, head of the Road Directorate, rejected the criticism, saying that the Audit Office did not consider the effect the financial crisis had on building projects. The crisis resulted, among other things, in major price decreases for various road projects.

The Vejdirektoratet is responsible for the more than 1,200km of motorways, a number of main roads and many of the country's bridges – a total of about 4,000km. Denmark, being a country mainly of islands, relies on its bridges and tunnels to help unify the nation culturally. It also means that they are vastly more important to the economic well-being of the nation than in most other states.

In  mid-2015, Denmark became the first country in the world to rely on GPS probe data to monitor traffic and congestion on a national scale. It chose INRIX, a provider of transportation intelligence and connected car services, to set up a real-time traffic information system throughout the country. The directorate monitors traffic flow and gridlock across its entire national road network.

Early last year, an Italian joint venture won the construction contract for what will be one of Denmark’s longest bridges, the replacement 4km-long road and rail Storstrom Bridge. The work went to the joint venture of 3481 Condotte and 3869 Grandi Lavori Fincosit along with bridge design consultant Seteco Ingegneria as a subcontractor. Estimated cost is around €550 million for the 24m-wide single-support cable-stayed structure. The European Union will subsidise the work to around €15 million.

World Highways recently interviewed Niels Pedersen, head of bridges at the %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 link-external Danish Road Directorate false https://www.worldhighways.com/categories/road-highway-structures/features/highly-relevant-denmarks-asset-management-for-bridges/ false false%>.

For more information on companies in this article

Related Content

  • INTERMAT launch for Volvo DD25 asphalt roller
    January 6, 2017
    Designed for smaller compaction projects, Volvo’s DD25 and DD25W are double drum compactors that fit into the 2.5 tonne weight class.
  • INTERMAT launch for Volvo DD25 asphalt roller
    February 7, 2012
    Designed for smaller compaction projects, Volvo’s DD25 and DD25W are double drum compactors that fit into the 2.5 tonne weight class.
  • Innovative concrete pumps developed by CIFA
    January 6, 2017
    CIFA is widening its range of innovative Carbotech concrete pumps with three new additions to the line-up. The firm introduced the first two truck-mounted models with carbon-fibre booms three years ago and the first two models in the range were the 45m class K45H and 62m class K62H. The new 29m class MK25H, 39m class K39H and 80m class K80H significantly broaden the Carbotech range. The most notable of these is the highly advanced K80H, which is now the concrete pump with the longest boom available for the
  • Innovative concrete pumps developed by CIFA
    February 7, 2013
    CIFA is widening its range of innovative Carbotech concrete pumps with three new additions to the line-up. The firm introduced the first two truck-mounted models with carbon-fibre booms three years ago and the first two models in the range were the 45m class K45H and 62m class K62H. The new 29m class MK25H, 39m class K39H and 80m class K80H significantly broaden the Carbotech range. The most notable of these is the highly advanced K80H, which is now the concrete pump with the longest boom available for the