Skip to main content

A rough ride for Denmark’s National Road Directorate

Denmark’s National Audit Office has criticised the Danish National Road Directorate for consistently miscalculating the level of investment required for road projects. The Road Directorate – Vejdirektoratet - used 33% less than budgeted for road projects from 2007-2017. The audit office said that "budget calculations by the transport ministry, including the Road Directorate, have not been accurate enough". Jens Holmboe, head of the Road Directorate, rejected the criticism, saying that the Audit Office
November 1, 2019 Read time: 2 mins
Denmark is not spending enough? (Roskilde Bridge, photo courtesy RBAI joint venture)
Denmark’s 5285 National Audit Office has criticised the Danish National Road Directorate for consistently miscalculating the level of investment required for road projects.


The Road Directorate – Vejdirektoratet - used 33% less than budgeted for road projects from 2007-2017. The audit office said that "budget calculations by the transport ministry, including the Road Directorate, have not been accurate enough".

Jens Holmboe, head of the Road Directorate, rejected the criticism, saying that the Audit Office did not consider the effect the financial crisis had on building projects. The crisis resulted, among other things, in major price decreases for various road projects.

The Vejdirektoratet is responsible for the more than 1,200km of motorways, a number of main roads and many of the country's bridges – a total of about 4,000km. Denmark, being a country mainly of islands, relies on its bridges and tunnels to help unify the nation culturally. It also means that they are vastly more important to the economic well-being of the nation than in most other states.

In  mid-2015, Denmark became the first country in the world to rely on GPS probe data to monitor traffic and congestion on a national scale. It chose INRIX, a provider of transportation intelligence and connected car services, to set up a real-time traffic information system throughout the country. The directorate monitors traffic flow and gridlock across its entire national road network.

Early last year, an Italian joint venture won the construction contract for what will be one of Denmark’s longest bridges, the replacement 4km-long road and rail Storstrom Bridge. The work went to the joint venture of 3481 Condotte and 3869 Grandi Lavori Fincosit along with bridge design consultant Seteco Ingegneria as a subcontractor. Estimated cost is around €550 million for the 24m-wide single-support cable-stayed structure. The European Union will subsidise the work to around €15 million.

World Highways recently interviewed Niels Pedersen, head of bridges at the %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 link-external Danish Road Directorate false https://www.worldhighways.com/categories/road-highway-structures/features/highly-relevant-denmarks-asset-management-for-bridges/ false false%>.

For more information on companies in this article

Related Content

  • Terex Genie launches world’s largest boom
    January 6, 2017
    Terex aerial work platform business Genie has unveiled, what it claims, is the world’s biggest self-propelled boom, the SX-180. Intended primarily for oil and gas industries, construction and industrial maintenance, the boom has a 54.9m vertical working height and a 24.4m horizontal reach. Equipped with a 2.44m by 0.91m basket, and a 3.05m rotating jib, the machine has a working capacity of 340kg.
  • Terex Genie launches world’s largest boom
    April 18, 2013
    Terex aerial work platform business Genie has unveiled, what it claims, is the world’s biggest self-propelled boom, the SX-180. Intended primarily for oil and gas industries, construction and industrial maintenance, the boom has a 54.9m vertical working height and a 24.4m horizontal reach. Equipped with a 2.44m by 0.91m basket, and a 3.05m rotating jib, the machine has a working capacity of 340kg.
  • Doosan updates short-radius 14tonner
    January 6, 2017
    Doosan Construction Equipment has launched a Dash-3 version of its popular reduced-radius 15tonne excavator, the DX140LCR-3. Powered by a Cummins QSB4.5 Stage IIIB-compliant engine, with exhaust gas recirculation (EGR) and a diesel particulate filter (DPF), the machine has 10% more power and 15% more torque than the previous model. Both main boom and dipper arm forces get an 8% boost, while travel speeds are increased to 5.3km/h, resulting in a claimed a 10% increase in productivity.
  • Doosan updates short-radius 14tonner
    April 16, 2013
    Doosan Construction Equipment has launched a Dash-3 version of its popular reduced-radius 15tonne excavator, the DX140LCR-3. Powered by a Cummins QSB4.5 Stage IIIB-compliant engine, with exhaust gas recirculation (EGR) and a diesel particulate filter (DPF), the machine has 10% more power and 15% more torque than the previous model. Both main boom and dipper arm forces get an 8% boost, while travel speeds are increased to 5.3km/h, resulting in a claimed a 10% increase in productivity.