Skip to main content

A rough ride for Denmark’s National Road Directorate

Denmark’s National Audit Office has criticised the Danish National Road Directorate for consistently miscalculating the level of investment required for road projects. The Road Directorate – Vejdirektoratet - used 33% less than budgeted for road projects from 2007-2017. The audit office said that "budget calculations by the transport ministry, including the Road Directorate, have not been accurate enough". Jens Holmboe, head of the Road Directorate, rejected the criticism, saying that the Audit Office
November 1, 2019 Read time: 2 mins
Denmark is not spending enough? (Roskilde Bridge, photo courtesy RBAI joint venture)
Denmark’s 5285 National Audit Office has criticised the Danish National Road Directorate for consistently miscalculating the level of investment required for road projects.


The Road Directorate – Vejdirektoratet - used 33% less than budgeted for road projects from 2007-2017. The audit office said that "budget calculations by the transport ministry, including the Road Directorate, have not been accurate enough".

Jens Holmboe, head of the Road Directorate, rejected the criticism, saying that the Audit Office did not consider the effect the financial crisis had on building projects. The crisis resulted, among other things, in major price decreases for various road projects.

The Vejdirektoratet is responsible for the more than 1,200km of motorways, a number of main roads and many of the country's bridges – a total of about 4,000km. Denmark, being a country mainly of islands, relies on its bridges and tunnels to help unify the nation culturally. It also means that they are vastly more important to the economic well-being of the nation than in most other states.

In  mid-2015, Denmark became the first country in the world to rely on GPS probe data to monitor traffic and congestion on a national scale. It chose INRIX, a provider of transportation intelligence and connected car services, to set up a real-time traffic information system throughout the country. The directorate monitors traffic flow and gridlock across its entire national road network.

Early last year, an Italian joint venture won the construction contract for what will be one of Denmark’s longest bridges, the replacement 4km-long road and rail Storstrom Bridge. The work went to the joint venture of 3481 Condotte and 3869 Grandi Lavori Fincosit along with bridge design consultant Seteco Ingegneria as a subcontractor. Estimated cost is around €550 million for the 24m-wide single-support cable-stayed structure. The European Union will subsidise the work to around €15 million.

World Highways recently interviewed Niels Pedersen, head of bridges at the %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 link-external Danish Road Directorate false https://www.worldhighways.com/categories/road-highway-structures/features/highly-relevant-denmarks-asset-management-for-bridges/ false false%>.

For more information on companies in this article

Related Content

  • VIDEO: Barcelona wheelchair user weaving in traffic, passes cars
    July 25, 2016
    A wheelchair-bound man in Spain has been caught on camera weaving in and out of Barcelona traffic and moving faster than surrounding vehicles. The street racer was cruising along Barcelona's Carrer de Muntaner when a motorcycle passenger took the video. You Tube videos of speeding wheel chair users are becoming more common. But so too are videos of people who generally want more mobility out their wheelchair. So click here to see a more sensible way to live life in your wheelchair in the fast lane. Appa
  • New event targeted at transport research alliance
    September 13, 2013
    A one day conference is planned intended to optimise transport research infrastructure in Europe. Run under the auspices of the European Transport Research Alliance (ETRA), this conference will help facilitate the wider and more balanced use of transport research infrastructures in Europe. It will also help link relevant research data bases and provide for exchanges of data. The idea is to promote cooperation and networking of research infrastructures as part of the process for creating the ERA – T, the Eur
  • Haulotte adds to rough terrain boom range
    January 6, 2017
    Haulotte has added the HT21RT and HT23RTJ to its self-propelled boom line-up. The HT21RT has a working height of 20.6m, up to 15.9m of outreach. It is available in both two-and four-wheel drive versions.
  • Haulotte adds to rough terrain boom range
    April 18, 2013
    Haulotte has added the HT21RT and HT23RTJ to its self-propelled boom line-up. The HT21RT has a working height of 20.6m, up to 15.9m of outreach. It is available in both two-and four-wheel drive versions.