Skip to main content

A rough ride for Denmark’s National Road Directorate

Denmark’s National Audit Office has criticised the Danish National Road Directorate for consistently miscalculating the level of investment required for road projects. The Road Directorate – Vejdirektoratet - used 33% less than budgeted for road projects from 2007-2017. The audit office said that "budget calculations by the transport ministry, including the Road Directorate, have not been accurate enough". Jens Holmboe, head of the Road Directorate, rejected the criticism, saying that the Audit Office
November 1, 2019 Read time: 2 mins
Denmark is not spending enough? (Roskilde Bridge, photo courtesy RBAI joint venture)
Denmark’s 5285 National Audit Office has criticised the Danish National Road Directorate for consistently miscalculating the level of investment required for road projects.


The Road Directorate – Vejdirektoratet - used 33% less than budgeted for road projects from 2007-2017. The audit office said that "budget calculations by the transport ministry, including the Road Directorate, have not been accurate enough".

Jens Holmboe, head of the Road Directorate, rejected the criticism, saying that the Audit Office did not consider the effect the financial crisis had on building projects. The crisis resulted, among other things, in major price decreases for various road projects.

The Vejdirektoratet is responsible for the more than 1,200km of motorways, a number of main roads and many of the country's bridges – a total of about 4,000km. Denmark, being a country mainly of islands, relies on its bridges and tunnels to help unify the nation culturally. It also means that they are vastly more important to the economic well-being of the nation than in most other states.

In  mid-2015, Denmark became the first country in the world to rely on GPS probe data to monitor traffic and congestion on a national scale. It chose INRIX, a provider of transportation intelligence and connected car services, to set up a real-time traffic information system throughout the country. The directorate monitors traffic flow and gridlock across its entire national road network.

Early last year, an Italian joint venture won the construction contract for what will be one of Denmark’s longest bridges, the replacement 4km-long road and rail Storstrom Bridge. The work went to the joint venture of 3481 Condotte and 3869 Grandi Lavori Fincosit along with bridge design consultant Seteco Ingegneria as a subcontractor. Estimated cost is around €550 million for the 24m-wide single-support cable-stayed structure. The European Union will subsidise the work to around €15 million.

World Highways recently interviewed Niels Pedersen, head of bridges at the %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 link-external Danish Road Directorate false https://www.worldhighways.com/categories/road-highway-structures/features/highly-relevant-denmarks-asset-management-for-bridges/ false false%>.

For more information on companies in this article

Related Content

  • Leica’s new Digicat xf-Series cable locators and transmitters
    January 6, 2017
    Leica Geosystems has launched the latest editions to the Digisystem product range: the Leica Digicat xf-Series. With Leica Geosystems’ new xf-Series cable locators and transmitters, users are said to be able to accurately detect and trace utilities faster and over a greater distance. The Leica Digicat xf-Series is said by the Swiss firm to have been specifically designed with long distance tracing in mind. The ability to trace transmitter frequencies of 512Hz and 640Hz provides users with a greater tracing r
  • Leica’s new Digicat xf-Series cable locators and transmitters
    January 30, 2013
    Leica Geosystems has launched the latest editions to the Digisystem product range: the Leica Digicat xf-Series. With Leica Geosystems’ new xf-Series cable locators and transmitters, users are said to be able to accurately detect and trace utilities faster and over a greater distance. The Leica Digicat xf-Series is said by the Swiss firm to have been specifically designed with long distance tracing in mind. The ability to trace transmitter frequencies of 512Hz and 640Hz provides users with a greater tracing r
  • Doka showcases Cut&Cover tunnel construction solution
    January 6, 2017
    Austrian firm Doka will be showcasing at bauma its first system to be specifically designed and optimised for cut-and-cover tunnel construction. With Doka CC (Cut and Cover), different types of traffic tunnel, such as rail or road tunnels, are said to be able to be built quickly, efficiently and safely. Doka says the creation of its innovative tunnel system was made possible only by the use of hi-tech construction materials and products such as the Composite formwork beam I tec 20. The choice of high-grade
  • Doka showcases Cut&Cover tunnel construction solution
    February 7, 2013
    Austrian firm Doka will be showcasing at bauma its first system to be specifically designed and optimised for cut-and-cover tunnel construction. With Doka CC (Cut and Cover), different types of traffic tunnel, such as rail or road tunnels, are said to be able to be built quickly, efficiently and safely. Doka says the creation of its innovative tunnel system was made possible only by the use of hi-tech construction materials and products such as the Composite formwork beam I tec 20. The choice of high-grade