Skip to main content

A rough ride for Denmark’s National Road Directorate

Denmark’s National Audit Office has criticised the Danish National Road Directorate for consistently miscalculating the level of investment required for road projects. The Road Directorate – Vejdirektoratet - used 33% less than budgeted for road projects from 2007-2017. The audit office said that "budget calculations by the transport ministry, including the Road Directorate, have not been accurate enough". Jens Holmboe, head of the Road Directorate, rejected the criticism, saying that the Audit Office
November 1, 2019 Read time: 2 mins
Denmark is not spending enough? (Roskilde Bridge, photo courtesy RBAI joint venture)
Denmark’s 5285 National Audit Office has criticised the Danish National Road Directorate for consistently miscalculating the level of investment required for road projects.


The Road Directorate – Vejdirektoratet - used 33% less than budgeted for road projects from 2007-2017. The audit office said that "budget calculations by the transport ministry, including the Road Directorate, have not been accurate enough".

Jens Holmboe, head of the Road Directorate, rejected the criticism, saying that the Audit Office did not consider the effect the financial crisis had on building projects. The crisis resulted, among other things, in major price decreases for various road projects.

The Vejdirektoratet is responsible for the more than 1,200km of motorways, a number of main roads and many of the country's bridges – a total of about 4,000km. Denmark, being a country mainly of islands, relies on its bridges and tunnels to help unify the nation culturally. It also means that they are vastly more important to the economic well-being of the nation than in most other states.

In  mid-2015, Denmark became the first country in the world to rely on GPS probe data to monitor traffic and congestion on a national scale. It chose INRIX, a provider of transportation intelligence and connected car services, to set up a real-time traffic information system throughout the country. The directorate monitors traffic flow and gridlock across its entire national road network.

Early last year, an Italian joint venture won the construction contract for what will be one of Denmark’s longest bridges, the replacement 4km-long road and rail Storstrom Bridge. The work went to the joint venture of 3481 Condotte and 3869 Grandi Lavori Fincosit along with bridge design consultant Seteco Ingegneria as a subcontractor. Estimated cost is around €550 million for the 24m-wide single-support cable-stayed structure. The European Union will subsidise the work to around €15 million.

World Highways recently interviewed Niels Pedersen, head of bridges at the %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 link-external Danish Road Directorate false https://www.worldhighways.com/categories/road-highway-structures/features/highly-relevant-denmarks-asset-management-for-bridges/ false false%>.

For more information on companies in this article

Related Content

  • Sennebogen shows dragline at INTERMAT
    April 19, 2012
    While draglines are now a rarity, Sennebogen showed its 50tonne operating weight duty cycle crawler crane, the 650HD, with 2.33 dragline bucket. The machine is one of a 10-model range with operating weights from 20-180tonnes and engines between 119 and 708kW. It can be used in civil engineering, mining, demolition or material handling.
  • bauma innovation awards shortlist lines up 15 potential winners
    January 6, 2017
    bauma has announced the shortlist for its Innovation Awards 2013, which will be presented at the show in mid April. Speaking at the event’s giant media dialog in Munich at the end of January 29, Johann Sailer, President of the VDMA Construction Machinery and Building Materials Machinery Association revealed that the organisers had received 156 entries across the scheme’s five main categories.
  • bauma innovation awards shortlist lines up 15 potential winners
    February 19, 2013
    bauma has announced the shortlist for its Innovation Awards 2013, which will be presented at the show in mid April. Speaking at the event’s giant media dialog in Munich at the end of January 29, Johann Sailer, President of the VDMA Construction Machinery and Building Materials Machinery Association revealed that the organisers had received 156 entries across the scheme’s five main categories.
  • High court drama expected at Highways UK event, NEC, Birmingham
    November 7, 2016
    What happens when a highways services employee is prosecuted for failing to follow established safety procedures? How would a courtroom drama unfold for the accused and the employer?