Skip to main content

A rough ride for Denmark’s National Road Directorate

Denmark’s National Audit Office has criticised the Danish National Road Directorate for consistently miscalculating the level of investment required for road projects. The Road Directorate – Vejdirektoratet - used 33% less than budgeted for road projects from 2007-2017. The audit office said that "budget calculations by the transport ministry, including the Road Directorate, have not been accurate enough". Jens Holmboe, head of the Road Directorate, rejected the criticism, saying that the Audit Office
November 1, 2019 Read time: 2 mins
Denmark is not spending enough? (Roskilde Bridge, photo courtesy RBAI joint venture)
Denmark’s 5285 National Audit Office has criticised the Danish National Road Directorate for consistently miscalculating the level of investment required for road projects.


The Road Directorate – Vejdirektoratet - used 33% less than budgeted for road projects from 2007-2017. The audit office said that "budget calculations by the transport ministry, including the Road Directorate, have not been accurate enough".

Jens Holmboe, head of the Road Directorate, rejected the criticism, saying that the Audit Office did not consider the effect the financial crisis had on building projects. The crisis resulted, among other things, in major price decreases for various road projects.

The Vejdirektoratet is responsible for the more than 1,200km of motorways, a number of main roads and many of the country's bridges – a total of about 4,000km. Denmark, being a country mainly of islands, relies on its bridges and tunnels to help unify the nation culturally. It also means that they are vastly more important to the economic well-being of the nation than in most other states.

In  mid-2015, Denmark became the first country in the world to rely on GPS probe data to monitor traffic and congestion on a national scale. It chose INRIX, a provider of transportation intelligence and connected car services, to set up a real-time traffic information system throughout the country. The directorate monitors traffic flow and gridlock across its entire national road network.

Early last year, an Italian joint venture won the construction contract for what will be one of Denmark’s longest bridges, the replacement 4km-long road and rail Storstrom Bridge. The work went to the joint venture of 3481 Condotte and 3869 Grandi Lavori Fincosit along with bridge design consultant Seteco Ingegneria as a subcontractor. Estimated cost is around €550 million for the 24m-wide single-support cable-stayed structure. The European Union will subsidise the work to around €15 million.

World Highways recently interviewed Niels Pedersen, head of bridges at the %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 link-external Danish Road Directorate false https://www.worldhighways.com/categories/road-highway-structures/features/highly-relevant-denmarks-asset-management-for-bridges/ false false%>.

For more information on companies in this article

Related Content

  • Fayat Group launches Bomag cold planer at INTERMAT
    February 16, 2012
    A working width of 600mm on Bomag’s BM 600/15 compact planer combines all the advantages of the smaller BM 500/15 compact planer with an eight tonne operating weight and a 20% more working width, said the company.
  • High versatility is claimed for Fayat’s new emulsion plant
    February 11, 2013
    From French firm FAYAT comes its new range of EP 10 emulsion plants equipped with the proven, low noise Bitumill emulsifier system. According to the firm, the plant is highly versatile and can be adapted to meet the needs of low or medium output installations. The equipment is mounted inside a standard 12.2m container making it easier to transport while the system has an ergonomic layout that is said to make it easy to use. An innovative closed-circuit hot water production system is said to reduce energy co
  • INTERMAT launch for Komatsu’s new PC700LC excavator
    January 6, 2017
    Improvements to Komatsu’s PC700LC have resulted in the Dash 8 version. Operator comfort gets the biggest change, with an all-new cab that gets a fixed, laminated front windscreen for increased operator protection, a heated high-back air-suspension seat, and a standard rear-view camera. Also new, for maximum efficiency said the company, is a widescreen LCD colour monitor panel that integrates Komtrax ‘step 3’ functionality with fuel consumption monitoring. The 323kW PC700LC-8 has an operating weight from 65-
  • INTERMAT launch for Komatsu’s new PC700LC excavator
    April 12, 2012
    Improvements to Komatsu’s PC700LC have resulted in the Dash 8 version. Operator comfort gets the biggest change, with an all-new cab that gets a fixed, laminated front windscreen for increased operator protection, a heated high-back air-suspension seat, and a standard rear-view camera. Also new, for maximum efficiency said the company, is a widescreen LCD colour monitor panel that integrates Komtrax ‘step 3’ functionality with fuel consumption monitoring. The 323kW PC700LC-8 has an operating weight from 65-