Skip to main content

Romania tenders for two sections of Pitesti-Sibiu motorway

Romania’s national road company has tendered two sections of the Sibiu-Pitesti motorway as part of ongoing work to complete the cross-country A1. Out to tender are sections 1 and 5 of the five-section Sibiu-Pitesti route. Romania’s Autostrada A1 will, when completed, will run for nearly 580km to connect Bucharest with the Banat and Crișana regions in the western part of the country. The motorway starts on the outskirts of Bucharest and runs to Pitești, Sibiu, Deva, Timișoara and Arad before crossing the b
May 14, 2018 Read time: 2 mins
Romania’s national road company has tendered two sections of the Sibiu-Pitesti motorway as part of ongoing work to complete the cross-country A1.


Out to tender are sections 1 and 5 of the five-section Sibiu-Pitesti route.

Romania’s Autostrada A1 will, when completed, will run for nearly 580km to connect Bucharest with the Banat and Crișana regions in the western part of the country. The motorway starts on the outskirts of Bucharest and runs to Pitești, Sibiu, Deva, Timișoara and Arad before crossing the border to connect with Hungary’s M43 motorway.

A 17km bypass around Sibiu has already been constructed.

The five-section Sibiu-Pitesti route, costing around €3 billion, is considered to be the most difficult route of the A1 to construct because it crosses the Carpathian Mountains.

Because the motorway is built along the Trans-European Transport Networks Rhine-Danube Corridor, around 85% of funding for construction comes from the European Union.

Related Content

  • Serbia and China discuss Preljina-Boljare section of Corridor XI
    September 4, 2017
    Serbia is in talks with China for construction of the Preljina - Boljare section of the pan-European Corridor XI. The section will connect Corridor XI to Corridor X. Corridor XI will run from the Montenegrin port of Bar to Belgrade and on to Bucharest, Romania. Corridor X links Salzburg, Austria, with the Greek Aegean port of Thessaloniki port, via Croatia, Slovenia, Serbia and Macedonia. This includes the construction of a motorway bypass of Belgrade.
  • Pennsylvania Turnpike celebrating 80th anniversary
    March 20, 2020
    The Pennsylvania Turnpike will celebrate its 80th anniversary during 2020.
  • Danish-German Fehmarn Belt road and rail tunnel hits funding snag
    July 9, 2015
    A Danish newspaper has learned of a significant European Union funding gap for one of Europe’s most ambitious transportation road and rail projects. The Fehmarn Belt Fixed Link would connect the German island of Fehmarn with the Danish island of Lolland. A submersed tunnel will cross the 18km-wide Fehmarn Belt, or Fehmarn Strait, in the Baltic Sea. Last February news emerged that contractors had revamped their cost estimates, adding nearly €1.2 billion to the project. This put the final cost of the 18
  • Two thirds of Corridor 10 motorway, Serbia finished
    July 3, 2013
    Serbian Minister of Transport Milutin Mrkonjic has reported that so far two thirds of construction works of the country’s Corridor 10 motorway have been completed. He said that a total of US$5.86 billion (€4.50bn) of loans have been approved for infrastructure projects, out of which $4.3 billion have not been realised, as previously stated by the Minister of Finance, Mladan Dinkic. The minister said that the Corridor 10’s most difficult build sections were between Nis and Dimitrovgrad, which has three large