Skip to main content

Romania tenders for two sections of Pitesti-Sibiu motorway

Romania’s national road company has tendered two sections of the Sibiu-Pitesti motorway as part of ongoing work to complete the cross-country A1. Out to tender are sections 1 and 5 of the five-section Sibiu-Pitesti route. Romania’s Autostrada A1 will, when completed, will run for nearly 580km to connect Bucharest with the Banat and Crișana regions in the western part of the country. The motorway starts on the outskirts of Bucharest and runs to Pitești, Sibiu, Deva, Timișoara and Arad before crossing the b
May 14, 2018 Read time: 2 mins
Romania’s national road company has tendered two sections of the Sibiu-Pitesti motorway as part of ongoing work to complete the cross-country A1.


Out to tender are sections 1 and 5 of the five-section Sibiu-Pitesti route.

Romania’s Autostrada A1 will, when completed, will run for nearly 580km to connect Bucharest with the Banat and Crișana regions in the western part of the country. The motorway starts on the outskirts of Bucharest and runs to Pitești, Sibiu, Deva, Timișoara and Arad before crossing the border to connect with Hungary’s M43 motorway.

A 17km bypass around Sibiu has already been constructed.

The five-section Sibiu-Pitesti route, costing around €3 billion, is considered to be the most difficult route of the A1 to construct because it crosses the Carpathian Mountains.

Because the motorway is built along the Trans-European Transport Networks Rhine-Danube Corridor, around 85% of funding for construction comes from the European Union.

Related Content

  • Slovakia keeps to planned D1 Hubova-Ivachnova completion date
    August 19, 2019
    Slovakia’s national motorway company NDS has confirmed the D1 motorway between Hubova and Ivachnova is on schedule to be completed by mid-2022. Work on the 15km stretch of road – effectively a bypass for the town of Ruzomberok –was started in 2013. But a major landslide in 2015 halted work, pushing back completion from 2017 to 2022 at the latest estimate. Montenegrin media report that the cost of the project has grown from €227 million in 2013 to nearly €289 million. Construction is being carried out
  • Another boost for Romania’s A3 Transylvania
    January 26, 2024
    The deal with the European Investment Bank is construction of a 42.3km section of the motorway between Nadaselu and Poarta Salajului.
  • Romania eyes new Danube River bridge
    August 20, 2024
    The announcement by Romania’s minister for transport, Sorin Grindeanu, comes as the Friendship Bridge, connecting Giurgiu in Romania and Ruse in Bulgaria, is closed for repairs.
  • Romania to tender for another A8 segment
    September 6, 2023
    The segment between Targu Mures and Targu Neamt could cost upwards of €6.35 billion.