Skip to main content

Romania to start work on the Sibiu-Pitesti A1 section in 2017

Work will start on the 120km Sibiu-Pitesti section of Romania’s A1 Freeway in 2017, Romanian media report. Around €1.6 billion will be spent on the route that will run through 20km of mountains. In February, the National Highway and Roads Company, CNADNR, selected the Milan-based Spea Ingineria Europea and Tecnic Consulting Engineering of Romania to update the feasibility study on the section, which is part of Romania’s A1 Freeway. But that contract has been challenged and will be scrutinised by th
April 17, 2015 Read time: 2 mins
Work will start on the 120km Sibiu-Pitesti section of Romania’s A1 Freeway in 2017, Romanian media report.

Around €1.6 billion will be spent on the route that will run through 20km of mountains.

In February, the National Highway and Roads Company, 2870 CNADNR, selected the Milan-based Spea Ingineria Europea and Tecnic Consulting Engineering of Romania to update the feasibility study on the section, which is part of Romania’s A1 Freeway.

But that contract has been challenged and will be scrutinised by the National Council for Solving Complaints (CNSC), according to the newspaper Nine o’Clock.

The A1 Freeway is also part of Corridor IV, one of the Pan-European transport corridors. It runs between Dresden and Nuremberg in Germany and then forks further south either to end in Thessaloniki in Greece or forks to Constanţa in Romania and then to finish in Istanbul, Turkey.

Sibiu is one of Romania’s most important cultural centres and was co-designated European Capital of Culture for the year 2007, along with the city of Luxembourg. It was formerly the centre of the Transylvanian Saxons and has been ranked as "Europe's 8th most idyllic place to live" by Forbes business magazine.

Pitești is situated further south along the A1 freeway and closer to the capital Bucharest. It is an important railway junction, has the Arpechim oil refinery and is a marketing centre for the automotive industry, in particular the Renault subsidiary Dacia.

The A1 Freeway is also part of Corridor IV, one of the Pan-European transport corridors. It runs between Dresden and Nuremberg in Germany and then forks further south either to end in Thessaloniki in Greece or forks to Constanţa in Romania and then to finish in Istanbul, Turkey.

For more information on companies in this article

Related Content

  • Romania to build wildlife bridges over the A1
    June 17, 2019
    Romania’s transport ministry says it plans to build animal crossings over the A1 motorway between Lugoj and Deva in the west of the country. The crossings will be over a 9km section of the A1 and cost around €180 million, said Razvan Cuc, the transport minister. nTenders will be issued for both the design and construction with work to start by the end of the summer. When completed, likely by the end of this year, the A1 will be 576km long and run across Romania in a south-east to north-west direction.
  • Chinese firms to work on Serbia’s Corridor 11 project
    November 30, 2015
    Serbia and China have signed a memorandum of understanding for construction of two sections of Serbia’s Corridor 11. The MoU was inked in during Serbian Prime Minister Aleksandar Vucic’s visit to the Chinese capital Beijing last week. Serbia’s Tanjug news agency reported that Vucic said the deal was worth around €209 million and included construction of the 18km Surcin-Obrenovac bridge. Corridor 11 runs from the Serbian capital Belgrade southwest to the border with Montenegro, another member state of
  • Tender on again for Baldana-Targoviste-Sinaia
    January 18, 2022
    The project in Romania will enlarge to four lanes the Baldana-Targovite section.
  • Romania sets aside €1.42 billion for local roads
    July 23, 2021
    Prime minister Florin Cîţu has had discussions with European Commission President Ursula von der Leyen to fund the country's proposed National Recovery and Resilience Plan, NRRP.