Skip to main content

Romania to start work on the Sibiu-Pitesti A1 section in 2017

Work will start on the 120km Sibiu-Pitesti section of Romania’s A1 Freeway in 2017, Romanian media report. Around €1.6 billion will be spent on the route that will run through 20km of mountains. In February, the National Highway and Roads Company, CNADNR, selected the Milan-based Spea Ingineria Europea and Tecnic Consulting Engineering of Romania to update the feasibility study on the section, which is part of Romania’s A1 Freeway. But that contract has been challenged and will be scrutinised by th
April 17, 2015 Read time: 2 mins
Work will start on the 120km Sibiu-Pitesti section of Romania’s A1 Freeway in 2017, Romanian media report.

Around €1.6 billion will be spent on the route that will run through 20km of mountains.

In February, the National Highway and Roads Company, 2870 CNADNR, selected the Milan-based Spea Ingineria Europea and Tecnic Consulting Engineering of Romania to update the feasibility study on the section, which is part of Romania’s A1 Freeway.

But that contract has been challenged and will be scrutinised by the National Council for Solving Complaints (CNSC), according to the newspaper Nine o’Clock.

The A1 Freeway is also part of Corridor IV, one of the Pan-European transport corridors. It runs between Dresden and Nuremberg in Germany and then forks further south either to end in Thessaloniki in Greece or forks to Constanţa in Romania and then to finish in Istanbul, Turkey.

Sibiu is one of Romania’s most important cultural centres and was co-designated European Capital of Culture for the year 2007, along with the city of Luxembourg. It was formerly the centre of the Transylvanian Saxons and has been ranked as "Europe's 8th most idyllic place to live" by Forbes business magazine.

Pitești is situated further south along the A1 freeway and closer to the capital Bucharest. It is an important railway junction, has the Arpechim oil refinery and is a marketing centre for the automotive industry, in particular the Renault subsidiary Dacia.

The A1 Freeway is also part of Corridor IV, one of the Pan-European transport corridors. It runs between Dresden and Nuremberg in Germany and then forks further south either to end in Thessaloniki in Greece or forks to Constanţa in Romania and then to finish in Istanbul, Turkey.

For more information on companies in this article

Related Content

  • Austria-Slovenia tunnel project awarded
    August 9, 2018
    Construction of the second tube of the Karawanks Tunnel connecting Austria and Slovenia is now going ahead. The work will be headed by Austrian contractors, ARGE Swietelsky Tunnelbau and Swietelsky Baugesellschaft. The 7.8km-long tunnel route runs under the Alpine Karawanks mountain range. The Austrian motorway operator Asfinag is investing around €168 million into the project, while the European Commission is providing €25 million. The work being carried out will include building new rescue routes as wel
  • Stantec: coming to an infrastructure site near you
    April 13, 2017
    Acquisitive Canadian firm Stantec is snapping up more transportation expertise as it moves out of its home North American market. David Arminas reports. Last December, politicians from the US states of Kentucky and Indiana celebrated the opening of the second of two major bridges. A ribbon-cutting ceremony took place in cold wintry weather on the new 762m-long cable-stayed Lewis and Clark Bridge. The event marked the finish of the prestigious three-and-half-year Ohio River Bridges Project.
  • Slovakia’s D4/R7 zero bypass of Bratislava picks up award
    February 10, 2017
    Slovakia’s D4/R7 zero bypass of Bratislava has picked up the Best Transaction in Europe award given by the UK magazine Project Finance International. The Ministry of Transport and Construction received the award in London in early February. The ministry said that the contract is notable for being the first whereby a project had combined funding from European Union investment and structural funds and the EU fund for strategic investment. World Highways reported in January that construction will start early
  • €600 million for Romania-Moldova motorway
    April 18, 2024
    A €600 million funding package for Romania-Moldova motorway.