Skip to main content

Romania speeds up motorway work, including A1 TENT route

Romania’s transport ministry has cut red tape to speed up 13 road projects this year. Work was stepped up on around 169km of motorway, including contracts on several projects to complete the A1 motorway. The section between Lugoj and Deva is set for the end of the year. The A1 motorway when finished, will be around 580km and connect the capital Bucharest with the Banat and Crișana regions in the western part of the country. Cities along the route include Pitești, Sibiu, Deva, Timișoara and Arad before
August 2, 2018 Read time: 2 mins
Part of AECOM’s Romanian A1 work (photo courtesy of AECOM)

Romania’s transport ministry has cut red tape to speed up 13 road projects this year.

Work was stepped up on around 169km of motorway, including contracts on several projects to complete the A1 motorway. The section between Lugoj and Deva is set for the end of the year.

The A1 motorway when finished, will be around 580km and connect the capital Bucharest with the Banat and Crișana regions in the western part of the country. Cities along the route include Pitești, Sibiu, Deva, Timișoara and Arad before reaching the Hungarian M43 motorway near Nădlac.

The A1 – around 400km are open - is part of the Trans-European Transport Networks Rhine-Danube Corridor and as such, gets 85% of its funding from the European Union.

Companies that have worked on the A1 Include 1397 AECOM that supervised construction the 9.6km Lugoj bypass in March 2008. Work included a 100m bridge over Timis River and two overpasses.

AECOM provided overall project management covering supervision of the works, including services during the defects notification period, assessment and approval of the materials, equipment and workmanship.

For more information on companies in this article

Related Content

  • Norway drops tender plans for second Sotra fixed link
    February 18, 2019
    Statens Vegvesen, the Norwegian Road Administration, has cancelled tender plans for a new Sotra fixed link project that were scheduled for the spring. Jon Georg Dale, minister of transport, recently told the Norwegian Parliament that the geology near Lake Storavatnet along the route of the project, of which the second bridge would be a part, has caused concern among planners. Also, reconstruction of a high-voltage power cable has come under questions. Helge Eidsnes, a regional manager of Statens Vegve
  • Realising a dream
    February 20, 2012
    Shem Oirere reports on how major highway projects in eastern African will improve links and the economies of a number of countries in the region
  • Czech republic to complete 80km of motorway out of 230km
    July 3, 2017
    The Czech government said that around 80km of highways out of 230km under construction will be finished this year. Completed work includes the upgraded sections of the D1 motorway.
  • Africa’s road builders need a reliable supply of good-quality bitumen
    May 8, 2015
    Crying out for consistency Getting hold of the right product, or any product at all, is often the challenge, as delegates to the Argus Africa Bitumen conference heard Many parts of Africa have ambitious road building plans for the next few decades. But clients and contractors are facing problems with the quality and supply of bitumen, delegates at the Argus Africa Bitumen conference were told. If there was one overriding message to come out of the conference, held in Dar Es Salaam, Tanzania in Feb